XRT- A25
Installation and Debugging
One Year
Complete Set of Equipment
380V
ISO, 220V/380V
Scraper Centrifuge, Rasper, Hydrocyclone
3 Tons to 25 Tons Per Hour for Your Selection
Auto Control and Manual Control
Stainless Steel
LIRETEC
Plastic and Wooden Case
Small, Medium and Large
China
Product Description
1. Project Consult
Project development plan/Project investment analysis / Project feasibility report / Product market research and sales strategy
2. Engineering Design
Factory plane layout design / Workshop plane layout design / Processing design /Public engineering design
3. Equipment Technology Service
New potato starch product line 5T/H--35 T/H
New sweet potato starch product line 3T/H--25 T/H
New cassava starch product line 3T/H--25T/H
4. Expand construction/ rebuild/elect equipment/ supply equipment (stand-alone, part unit, whole production line)/equipment install and test
- The warranty period of the equipment and materials of the Contract plant supplied by the Seller shall be 12 months after the date of acceptance of the Contract plant by the Buyer, but not later than 18 month after the date of delivery.
- Within the validity period of the Contract, the Seller answer in time the questions put forward by the Buyer in connection with the design and technical items in the scope of the Contract and provide free of charge the relevant technical documentation to the Buyer.