

TWD100 Trailer mounted drilling rig can drilling in all kinds formations by mud diling in soft formation and air DTH hammer in rock drilling.DTH Hammer is applied in rock dilingslag is discharged by airpressure and the effstage efficiency is ten times than traditional rotary driling
>> The drilling rig can use air DTH Hammer drilling and mud drilling.
>> Centralized control console is suitable for each manipulaion and contro. Rapid puling and lifing reduce the auxiiary time and enhance the work eficiency
>> The main drive system, the transfer case, gearbox, double-winch unit, mud pump, tumtable,driling tower, feed system are set up on the chassis.
>> It's a hvdrauicrolay dhiing nio with directional circualon.lteouip with a BW160 mud pump which adopts the slury as the washing fluid and can dril on clav, sandand rock if it is equipped with suitable drilling bit.
>> The power of drling rig comes from a 24kw AMEC diesel engine drives the large displacement high pressure plunger pump and itis characterized by powerfudynamic and stable perfommance.

Description | TWD100A |
Geology drilled | F=6-14 |
Drill depth | 0-110 m |
Drilling Diameter | 90 - 180mm |
Drill system and operation | Hydraulic |
Rig assembly | 1 complete unit, main engine driven |
Mobility | 2 wheel tandem road trailer |
Transportation | Towed by pickup or light truck |
Drill pipe (diameter x length) | 60*2000mm |
Mud pump(Optional) | BW200 |
Foam pump | Optional |
Weight | 1300 kg |
Rotation & Feed System | |
Top head drive by a hydraulic cylinder through heavy duty chain. | |
Rotation torque | 1200 N-m |
Speed | 60-120 rpm. |
Head travel | 1.95 meter |
Pull-up capacity | 5000 kgs |
Pull-down Capacity | 3000 kgs |
Pull-up speed-slow feed | 1.22 meter/min |
Pull-up speed-rapid feed | 12.26 meter/min |
Pull-down speed-slow feed | 0-1.88 meter/min |
Pull-down speed-rapid feed | 0- 16.90 meter/min |
Diesel engine | |
Power | 24KW |
MODEL | AMEC |
Drill Pipe | |
Drill pipe length | 2 meter |
Drill pipe diameter | 60 mm |
Thread | 2 3/8 REG API Mod |
Power pack speed | 3000 rpm. |
Load power pack | max. 47 hp. |
Mud pump(Optional) | |
Flow capacity | 200 liter/min |
Max. working pressure | 40 bar |
Hydraulic System | |
Hydraulic tank capacity | 140 liter |
Stabilizing Jack | |
1 front jacks and 2 rear jacks. | |
Type | Mechnical type |
Stroke | 350 mm |
Air System | |
Lubricator of venturi-type for down-the-hole drills. | |
Max. pressure | 25 bar |
Oil tank capacity | 4 liter |
Dimensions | |
Overall length | 3000 mm |
Overall width | 1550 mm |
Overall height | 2000 mm |














Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. | A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. | A: 365×24 Year-round Service | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |
![]() TWD CWD200 Crawler Type Drilling Rig for Drilling 200m | TWD![]() TWD TWD200 Trailer Type Drilling Rig for Drilling 200m | ![]() CSD300A Truck Type Drilling Rig for Drilling 300m |