Knurled Brass Insert Nut
Brass
Round Head
Common Bolt
Round
DIN, GB
4.8
M
Packages
1100*800
Ningbo
73181600
Product Description
Knurled Brass Insert Nut
Material | Stainless Steel, brass, Aluminum, According to Customer's requirement |
Finish | Zinc, Electroplating, Passivation |
Lead Time | 3-15 wording days |
Samples | Welcome |
Size | Metric: M2,M2.5,M3,M4,M5,M6,M8 |
Package | Bags + Cartons |
Delivery Time | 7-10 days |
Delivery Term | FedEX, DHL, UPS, TNT, by Ocean, by Air. |
Warranty | Replacement for rejected products or refund |
Certification | SGS, RoHS, Material Certification |
Production Capability | Auto-lathe turning: OD0.5-20mm, +/-0.01mm |
CNC lathe machining: OD0.5-25mm, +/-0.005mm | |
CNC Milling: 800*600mm, +/-0.005mm | |
Screw heading & rolling: Metric 0.8-M8, Unified Imperial #2-1/4'' |






The Ningbo Beilun Milfast Metalworks Co., Ltd. is a professional fasteners company in Ningbo, specialize in the Threaded Rods, Studs, Bolts, Nuts, Washers and the Stamping metal parts. With the products quality and good service, we have gained the credit from our customers.
The Milfast Metalworks products include various different specifications and types: THREADED RODS, STUD BOLTS, HEAVY HEX BOLTS, STRUCTURAL BOLTS, HEX BOLTS, FLANGE BOLTS, TRACK BOLTS, CARRIAGE BOLTS, HEAVY HEX NUTS, STRUCTURAL NUTS, HEX NUTS, FLANGE NUTS, CASTLE NUTS, SQUARE NUTS, FLAT WASHERS, SPRING WASHERS, SPECIAL FASTENERS AND OTHER VARIOUS METAL PARTS.
The materials for these products are carbon steel, alloy steel, stainless steel. In addition, we also can provide special fasteners according to customers′ drawing or samples.




Q: Are you trading company or manufacturer ?
A: We are factory and OEM are available.
Q: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment or L/C.
If you have another question, pls feel free to contact us as below: