LED Strobe Stage Light 1kw RGB 3in1 DJ Nightclub DMX

Price $130.00 Compare
Min Order 1 Piece
Shipping From Guangdong, China
Popularity 238 people viewed
Quantity
+-
 

Guangzhou Ao Mei Di Stage Lighting Equipment Co., Ltd.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
AMD8125
Strobe Light
RGB
Stage, Dance Effect Lights
IP20
CE, RoHS
1000W
3-in-1 High-Brightness LED5054 SMD SMD Lamp Bead
1000PCS
1.0W / Piece
Colorful Strobe Effect and Uniform RGB Infinite Co
16CH / 6CH
Zone 5
AOMEIDI
56*42.5*35cm(2PCS)
54 * 32 * 20.5CM
Guangzhou City
Product Description

 

VoltageAC110V-240V, 50-60Hz
Power1000W
Light source3-in-1 high-brightness LED5054 SMD SMD lamp bead
Number of beads1000pcs
Lamp power1.0W / piece
Effectcolorful strobe effect and uniform RGB infinite color mixing system, wash, rainbow effect
Channel16CH / 6CH
Mode partitionZone 5
Operating modeDMX / voice / master-slave/auto movement
Strobe speed0~20 times / Sec.
Dimmer0-100% linear dimmer
IP ratingIP20
Product size54 * 32 * 20.5CM
Carton package size56*42.5*35cm(2pcs)
WeightN.W:7.5KG(1pcs)     G.W:8KG(1pcs)









Warranty:
a) We have One year warranty for our products.
b) For damage on arrival, please claim to the shipping company firstly and get the claim number and inform us,also take the photos on the damage and send to us for verifying, we will help you to claim to the shipping company to get the compensation.
c) If there is the problem with the product, firstly you need send the pictures or the video to us, let us make surewhat's problem about the product. If the problem can use the parts to solve,
we will offer you the replacement for free during warranty time.

FAQ:
Q:Are you a factory or trade company?
A:We are a professional stage lighting factory.
Q:Do you accept OEM or ODM?
A:We accept OEM but not for ODM now.
Q:What's the delivery time?
A:Usually,it costs about 3 to 7 days for sample and more time for bulk order.Eg,as for a 20 cabniet,we need about 20 days to prepare well.
Q:What's the payment term?
A:We accept T/T,western union and paypal.
Q:Are the products of good quality?How can you ensure it?
A:Yes,the quality is good.We have strict test before shipping.We have test for semi-manufactured products about 3 days and 2 days for end products.
Company Information:
Guangzhou Ao Mei Di Stage Lighting Equipment Company was built in 2006.It is a professional enterprise of high new technology in producing stage lighting equipment. Its workshop covers an
area of 6000squaremeters and total area over 9000squaremeters.

Your satisfication is our goal.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA