Large Cold Isostatic Press Equipment Pressing Machine CIP with CE Certificate

Price Negotiable Compare
Min Order 1 set
Shipping From Jiangsu, China
Popularity 383 people viewed
Quantity
+-
 

Chinasun International Industry Co., Ltd.

VIP   Audited Supplier 17 years
Profile Certified by SGS/BV
24 Months
Automation, Precision, High Efficiency
Customized
New
2 Years
Cold Isostatic Press (CIP)
1000mm-2500mm
1500mm-6000mm
50-400MPa
50Hz, 380V, Three-Phase Five Wire System
PLC(Siemens)+HMI(Mcgs) / Automatic and Manual Mode
Emulsion
L-Hm32 Anti-Wear Hydraulic Oil
0 to 9999s Setting Freely
0.5 Level
Dual Language (Chinese + English)
Reciprocating Superchargers Pressure Increase
Automatically, Adjustable
Relative Humidity Not More Than 90%
Gantry Hydraulic Press
CCC, ISO9001, CE, PED
SHUOHAIPU
Pallet Package
CIP D1000-2500MM/H1500-6000MM/P50-400MPA
China
8479899951
Product Description
Company Profile
Sichuan Sohaipu Isostatic Press Technology Equipment Co., Ltd. was founded in 2005. It is a leading manufacturer dedicated to research, development and manufacture of cold isostatic presses. We are famous for its efficient R&D and technological breakthroughs.
Our 
company has large-scale mechanical production capacity, with 5-meter vertical lathe, 2*10-meter horizontal lathe, 2.5x6.5 CNC gantry milling machine and other large-scale mechanical equipment, using advanced strand technology, cold stability, long life. Guarantee isostatic pressure.
Product Description

At present, cold isostatic press has been widely used in industrial ceramics pressure forming, high temperature refractories, cemented carbides, permanent magnets, rare metal powder forming and other fields, occupying a considerable market share. Up to now, we have provided more than 500 sets of isostatic presses to the Chinese and international markets. All our products have passed the CE certification with PED clause issued by the European Union. Export countries or regions include Brazil, Russia, Europe, India, Taiwan and etc..
 



 

Product Parameters

 

S.NO.TypeDiameter of Pressure 
Vessel
Height of Pressure
 Vessel
Maximum Isostatic 
Pressure
1CIP 200/300-300200mm300mm300Mpa
2CIP 200/1000-300200 mm1000mm 300Mpa  
3CIP 420/4000-320420mm4000mm320Mpa 
4CIP 500/1200-400500mm1200mm400Mpa
5CIP 500/1500-300500mm1500mm300Mpa
6CIP 710/2000-250710mm2000mm250Mpa
7CIP 1000/3500-2001000mm3500mm200Mpa
a. The vessel inner materials is 34CrNi3MoV alloy whole parts forged and then The forged vessel be wire wounded by alloy of wire(65Mn steel 1.5mm x 6mm size) as per the designed.
b.Whole procedure of the cold isostatic pressing (CIP) machine, increasing, holding and releasing pressure is controlled by PLC and also there is a decompression system to protect the system over pressure to keep the machine in safety running.
Equipment components

The equipment consists of four parts: Suppression system, hydraulic system, filling and pumping system and electrical control system.

Filling and pumping system

The liquid filling and pumping system can quickly draw out the working medium from the working cylinder and quickly fill the working medium into the cylinder.The filling and pumping pump adopts an independent forward and reverse gear pump to ensure the independence of the filling and pumping system.
The pump set and large diameter pipeline form a filling and pumping system.

We and our customers:

 

 

After Sales Service
1.Within the warranty period, we shall immediately reply and guide troubleshooting within 1 hour after receiving the buyer's equipment failure notice. If it cannot be solved, we shall arrive at the buyer's  production site for maintenance and troubleshooting within 24 hours.

2.
We shall provide major and medium-sized equipment repair services, spare parts and wearing parts services in a long-term preferential manner. Provide technical support and quality tracking for the use of equipment for life.

3.
Be responsible for equipment installation and debugging  until it passes the acceptance.

4.We shall train the buyer's maintenance workers and operators free of charge.The training is divided into two parts: theoretical training and practical training.
The training shall be conducted in two times. The first time, theoretical and practical training shall be conducted during the general assembly, debugging and pre-acceptance at our production site for one week; For the second time, the maintenance and operation training shall be conducted from the whole process of hoisting, installation, debugging and acceptance  at the buyer's installation site.
2 ~ 3 equipment operators shall be trained free of charge. The training content includes: equipment operation, use, daily maintenance, etc., so that the trainees can operate the equipment independently.

5.Our
 shall be responsible for the effect and quality of the training. If the training provided cannot meet the requirements, the buyer has the right to require retraining or extend the training time by itself.
 
Certifications



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA