Our company has large-scale mechanical production capacity, with 5-meter vertical lathe, 2*10-meter horizontal lathe, 2.5x6.5 CNC gantry milling machine and other large-scale mechanical equipment, using advanced strand technology, cold stability, long life. Guarantee isostatic pressure.
At present, cold isostatic press has been widely used in industrial ceramics pressure forming, high temperature refractories, cemented carbides, permanent magnets, rare metal powder forming and other fields, occupying a considerable market share. Up to now, we have provided more than 500 sets of isostatic presses to the Chinese and international markets. All our products have passed the CE certification with PED clause issued by the European Union. Export countries or regions include Brazil, Russia, Europe, India, Taiwan and etc..



S.NO. | Type | Diameter of Pressure Vessel | Height of Pressure Vessel | Maximum Isostatic Pressure |
1 | CIP 200/300-300 | 200mm | 300mm | 300Mpa |
2 | CIP 200/1000-300 | 200 mm | 1000mm | 300Mpa |
3 | CIP 420/4000-320 | 420mm | 4000mm | 320Mpa |
4 | CIP 500/1200-400 | 500mm | 1200mm | 400Mpa |
5 | CIP 500/1500-300 | 500mm | 1500mm | 300Mpa |
6 | CIP 710/2000-250 | 710mm | 2000mm | 250Mpa |
7 | CIP 1000/3500-200 | 1000mm | 3500mm | 200Mpa |
b.Whole procedure of the cold isostatic pressing (CIP) machine, increasing, holding and releasing pressure is controlled by PLC and also there is a decompression system to protect the system over pressure to keep the machine in safety running.
The equipment consists of four parts: Suppression system, hydraulic system, filling and pumping system and electrical control system.
The liquid filling and pumping system can quickly draw out the working medium from the working cylinder and quickly fill the working medium into the cylinder.The filling and pumping pump adopts an independent forward and reverse gear pump to ensure the independence of the filling and pumping system.
The pump set and large diameter pipeline form a filling and pumping system.


1.Within the warranty period, we shall immediately reply and guide troubleshooting within 1 hour after receiving the buyer's equipment failure notice. If it cannot be solved, we shall arrive at the buyer's production site for maintenance and troubleshooting within 24 hours.
2.We shall provide major and medium-sized equipment repair services, spare parts and wearing parts services in a long-term preferential manner. Provide technical support and quality tracking for the use of equipment for life.
3.Be responsible for equipment installation and debugging until it passes the acceptance.
4.We shall train the buyer's maintenance workers and operators free of charge.The training is divided into two parts: theoretical training and practical training.
The training shall be conducted in two times. The first time, theoretical and practical training shall be conducted during the general assembly, debugging and pre-acceptance at our production site for one week; For the second time, the maintenance and operation training shall be conducted from the whole process of hoisting, installation, debugging and acceptance at the buyer's installation site.
2 ~ 3 equipment operators shall be trained free of charge. The training content includes: equipment operation, use, daily maintenance, etc., so that the trainees can operate the equipment independently.
5.Our shall be responsible for the effect and quality of the training. If the training provided cannot meet the requirements, the buyer has the right to require retraining or extend the training time by itself.