The "Plastic Sealing Tape Assembler" is an automated machine that primarily uses automated equipment to feed, arrange, and assemble plastic sealing tapes and multiple round buttons automatically onto the sealing tape products that come out of the injection molding process.
Purpose of Using the Machine:
- To save labor.
- To improve efficiency.
- To ensure the uniformity of products.
Detailed Introduction:
The product parts are automatically fed using a vibration bowl, which can store a large amount of materials.
The equipment combines electrical and continuous rapid feeding mechanisms.
The machine can automatically detect missing or extra installations and automatically separate defective products.
The equipment has fault alarm and automatic counting functions.
Applicable Scope of the Equipment:
- Assembly and inspection of various plastic and hardware products.
Specific Parameters are as Follows:
- Power: 1.2~2KW/H
- Power Supply: 220V/50HZ
- Equipment Use: Part assembly
- Usage Range: Assembly of various parts
- Air Pressure Range: 0.5~0.8MP/CM2
- Capacity: 100~120PCS/minute
- Outer Dimensions: 1.5M * 1.2M * 1.5M
This machine is designed to streamline the assembly process of plastic sealing tapes and related products, ensuring consistency and efficiency in production while reducing the need for manual labor.
Technical Specifications:
Power supply | 220V AC 50HZ |
Pressure | >0.5 MPa |
Production | 100-120 PCS |
After sales | One year warranty, lifetime maintenance |
Applications | Container Lock Cable Tie |

A: Within 35 working days after received advanced payment.
Q: What about your machine warranty?
A: One year warranty after machine reached customer's workshop.
And will responsible for lifetime maintenance
Q: How about your service?
A: Before Sales Serive:
1. We will confirm the right model according to the offered inforamtion.
2. Welcome to visit our factory and workshop before you place an order.
After Sales Service:
1. We provide manual,detailed machine installation,commissioning video for operate machine.
2. We provide free installation,commissioning and training at our factory.
Ifyou need engineer go to your factory for machine training, air ickets,food,hotel, local transportation, engineer's salary should be at your account.
3. Any problems on machine,we will reply you by email/tel or other online contact within 24 hours.
Q: What about delivery terms and payment terms?
A:Delivery terms: 50% deposit, 50% paid before shipment.
FOB Ningbo, ClF your port
Payment Terms: T/T, L/C