Lianggong Skydeck Formwork Slab Formwork for High Building

Price $35.00 Compare
Min Order 100 Pieces
Shipping From Jiangsu, China
Popularity 465 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
formwork
Online Technical Support, Onsite Installation
1 Year
ISO, ISO9001
Q355steel
Slab Formwork
Steel
Hotel, Wall, Column, Core Tube, etc
Jiangsu, China
Customised
Slab Formwork
50 Sets
Lianggong
Standard Package
Standard & Customized
Yancheng, China
730840
Product Description

Product Description

T-Form System

Item Model Dimention AreaUnit weight
(kg)

T-Form Panel
TF18121800X1200mm2.1644.000 
TF18091800x900mm1.6238.000 
TF18061800x600mm1.0830.000 
TF15121500X1200mm1.840.600 
TF15091500x900mm1.3533.000 
TF15061500x600mm0.925.000 
TF12121200x1200mm1.4432.000 
TF12091200x900mm1.0826.000 
TF12061200x600mm0.7222.000 
TF0909900x900mm0.8122.000 
TF0906900x600mm0.5418.000 
TF0606600x600mm0.3613.500 
 

T-form for Slab concrete 

T-form is for horizontal floor concrete.With many sizes,the biggest size is 1800X1200 mm, each panel with the early stripping mechanism,it can shorten the construction period and save your time. 
The erection speed is as high as 60-100 square meters per person per day.
Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.3-4 workers in a team can quickly and easily set up and remove the panels.
 
Products Show
 



Characteristics
 
 
1.More Quickly:
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.

2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly

3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories

4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.

5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.

6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.

7.Standardized panel for various structure building
- All formwork component can be reusable on different project.

Packing & Delivery
Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 25-30 days, it is according to quantity.
Port:  Shanghai,Qingdao


Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

 
Our Company


Customer Photos
 
Certifications
FAQ

Q1:Are you trading company or manufacturer?
A:We are manufacturer for 12 years.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3-5 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~40 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA