formwork
Online Technical Support, Onsite Installation
1 Year
ISO, ISO9001
Q355steel
Slab Formwork
Steel
Hotel, Wall, Column, Core Tube, etc
Jiangsu, China
Customised
Slab Formwork
50 Sets
Lianggong
Standard Package
Standard & Customized
Yancheng, China
730840
Product Description
Product Description
T-Form System
Item | Model | Dimention | Area | Unit weight (kg) |
T-Form Panel | TF1812 | 1800X1200mm | 2.16 | 44.000 |
TF1809 | 1800x900mm | 1.62 | 38.000 | |
TF1806 | 1800x600mm | 1.08 | 30.000 | |
TF1512 | 1500X1200mm | 1.8 | 40.600 | |
TF1509 | 1500x900mm | 1.35 | 33.000 | |
TF1506 | 1500x600mm | 0.9 | 25.000 | |
TF1212 | 1200x1200mm | 1.44 | 32.000 | |
TF1209 | 1200x900mm | 1.08 | 26.000 | |
TF1206 | 1200x600mm | 0.72 | 22.000 | |
TF0909 | 900x900mm | 0.81 | 22.000 | |
TF0906 | 900x600mm | 0.54 | 18.000 | |
TF0606 | 600x600mm | 0.36 | 13.500 |
T-form for Slab concrete
T-form is for horizontal floor concrete.With many sizes,the biggest size is 1800X1200 mm, each panel with the early stripping mechanism,it can shorten the construction period and save your time.
The erection speed is as high as 60-100 square meters per person per day.
Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.3-4 workers in a team can quickly and easily set up and remove the panels.
Products Show




Characteristics
Packing & Delivery




Characteristics
1.More Quickly:
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.
2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly
3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories
4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.
5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.
6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.
7.Standardized panel for various structure building
- All formwork component can be reusable on different project.
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.
2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly
3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories
4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.
5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.
6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.
7.Standardized panel for various structure building
- All formwork component can be reusable on different project.
Packing & Delivery
Packing Details : Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 25-30 days, it is according to quantity.
Port: Shanghai,Qingdao
Delivery Details : Generally it is 25-30 days, it is according to quantity.
Port: Shanghai,Qingdao


Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.


Our Company



Customer Photos




Certifications


FAQQ1:Are you trading company or manufacturer?