1) Economic:quick installed and saving the cost of construction.
2) Reliable quality: mainly produced in the factory and control the quality.
3) Big space: the max span of prefab steel structure can reach 80meters.
4) Anti-seismic: because the weight is light.
5) Flexible: can be dismantled and enlarged.
6) Beautiful appearance: can use different colors.
7) Long service life that main frame can be used at least 50 years

MAIN BUILDING MATERIAL SPECIFICATIONS&STANDARD
Standard | ASTMA53/ASTM A573/ASTM A283/Gr.D/ BS1387-1985/ GB/T3091-2001,GB/T13793-92, ISO630/E235B/ JIS G3101/JIS G3131/JIS G3106/ |
Material | Q195,Q215,Q235B,Q345B, ASTM A283 C, S235JR/S235/S355JR/S355 SS440/SM400A/SM400B |
Technique | Hot Rolled, cold-rolled, Welded |
Certification | CE, SGS, ISO, CCC, NEMA |
Size | H(mm) | Tolerance (mm) | B(mm) | Tolerance (mm) | Thickness (mm) | Tolerance (mm) | Weight (kg/m) |
8# | 80 | ±2.0 | 50 | ±2.0 | 4.5 | ±0.5 | 7.520 |
10# | 100 | ±2.0 | 68 | ±2.0 | 4.5 | ±0.5 | 11.261 |
12# | 120 | ±2.0 | 74 | ±2.0 | 5.0 | ±0.5 | 13.987 |
14# | 140 | ±2.0 | 80 | ±2.0 | 5.5 | ±0.5 | 16.890 |
16# | 160 | ±2.0 | 88 | ±2.5 | 6.0 | ±0.5 | 20.513 |
18# | 180 | ±2.0 | 94 | ±2.5 | 6.5 | ±0.5 | 24.143 |
20A | 200 | ±3.0 | 100 | ±3.0 | 7.0 | ±0.7 | 27.929 |
20B | 200 | ±3.0 | 102 | ±3.0 | 9.0 | ±0.7 | 31.069 |
22A | 220 | ±3.0 | 110 | ±3.0 | 7.5 | ±0.7 | 33.070 |
22B | 220 | ±3.0 | 112 | ±3.0 | 9.5 | ±0.7 | 36.524 |
25A | 250 | ±3.0 | 116 | ±3.0 | 8.0 | ±0.7 | 38.050 |
25B | 250 | ±3.0 | 118 | ±3.0 | 10.0 | ±0.7 | 42.030 |
28A | 280 | ±3.0 | 122 | ±3.0 | 8.5 | ±0.7 | 43.492 |
28B | 280 | ±3.0 | 124 | ±3.0 | 10.5 | ±0.7 | 47.888 |
30A | 300 | ±3.0 | 126 | ±3.0 | 9.0 | ±0.7 | 48.084 |
30B | 300 | ±3.0 | 128 | ±3.0 | 11 | ±0.7 | 52.794 |
Specifications: 10#-63#AB
PROJECT EXHIBITION
ABOUT US
With the operation philosophy of "Clients come first" and enterprise object of achiving innovation excellence, Taiwei is marching forward with big strides towards a internationalized enterprise.
And we can offer" One stop service from design, manufacture, deliver to installation and after-service".



OUR ADVANTAGES
1. Certificate: ISO, BV, CE, SGS
2. Feedback within 24 hours
3. Cheap price based on good quality
4. Quick delivery
5. Production Capacity:3000tons/Month
6. Experience for ten years, specilized in manufacturing and exporting
7. Customers from many continents, such as North America, South America, Europe, Africa, etc.


MAIN EXPORT MARKET
Middle East, Africa,North and South America,East and West Europe,Southeast Aisa Austriailia
PACKING & DELIVERY
Packaging Detail: Suitable package for the long sea transport; In bundle with bulk; As customer's requirements.
Delivery Date:15-45 days after receiving the deposit

FAQ
1.How about the cost of prefabricated building?
Compared with concrete buildings, assembly buildings are lighter in quality and more economical. Factory production to reduce the labor intensity and time of the installation workers at the construction site.
2.How long is the service life of the portal H-type steel frame?
The service life of the main steel frame can last for 50years.
3.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)
4.What is the advantages of the steel frame compared to the traditional building?
The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.
5.How can I assemble the portal H-type steel frame?
All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.