DRYC554-C
24 Hours Around Clock
Bolt Connection
Steel Column
Quality Carbon Structural Steel And Alloy Structural Steel
Hot-Rolled Steel
Wall Support
GB, ASTM, DIN, JIS, AISI, BS
H-Section Steel
Frame Structure
More Than 25 Years
Sandwich Board, Steel
Modern
C/Z Galvanized Steel (Q235, Q355)
Sandwich Board/Color Steel Plate
Sandwich Board/Color Steel Plate
Aluminum Alloy or PVC
Rolling Shutter Door
According to Customers
Steel Workshop, Steel Structure Platform
Hot-Rolled Steel
Steel Column
H-Section Steel
DRYC, Carbon Structural Steel
Standard Packing
Customized
Qingdao
73089000
Product Description
Rapid Construction & Cost Efficiency
Unmatched Strength & Safety
Flexible Design & Space Optimization
Sustainability & Green Credentials
Adaptability for Future Needs
Global Market Appeal

Unmatched Strength & Safety
Flexible Design & Space Optimization
Sustainability & Green Credentials
Adaptability for Future Needs
Global Market Appeal

ITEMS | SPECIFICATION | |
Main Steel Frame | Colum | Q235, Q355 Welded H Section Steel |
Beam | Q235, Q355 Welded H Section Steel | |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance System | Roof System | Roof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories |
Wall System | Wall Panel (Sandwich Panel or Corrugated Steel Sheet | |
Window System | Aluminum Alloy Window/ PVC Window/Skylight | |
Door System | Sliding Sandwich Panel Door/Rolling Metal Door/PVC Door | |
Others | PVC Rainspout,Gutter etc | |
Wind Resisitance Grace | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure life span | Up to 50 years | |
Temperature | Suitable temperature -50ºC~+50ºC | |
Certification | CE, SGS, ISO9001:2015, ISO 14001:2015 | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkyd painting, two primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.) or Galvanized. |






2. Dingrui Yongcheng has domestically advanced intelligent fully automatic new building materials processing and production lines, which can independently complete a series of processes such as steel plate cutting, transmission, assembly, flipping, welding, and correction, truly realizing the fully automatic process of industrialized production and mechanized operations.
3. In the future, Dingrui Yongcheng will continue to adhere to the principle of "quality first"provide customers with high-quality one-stop solutions with a pioneering and enterprising corporate style, and a pragmatic and efficient corporate spirit.

2. Experienced designers, using auto CAD and other professional design software, to provide customers with different design solutions. Can meet the requirements of different customers
3. We have the national second level general contracting qualification for housing construction projects, ISO9001.ISO 45001. and ISO 14001 quality system certifications.
4. Based on the principle of quality first and customer first, we provide customers with one-stop service from design to service to meet the different needs of customers around the world




A: We are an integrated industry and trade company. You are welcomed to visiting our factory. The quality control flow and sales team will show you our professionalism.
Q: Whats the quality assurance you provided and how do you control quality?
A: There is a procedure to check products at all stages of the manufacturing process -raw materials, in process materials, validated or tested materials,finished goods, etc. SGS, BV and other testing are available for us.
Q: Can you offer designing service?
A: Yes, we have more than 20 experienced designers. We could design full solution drawings as per your requirements. By using Auto CAD, PKPM, MTS3D3S,Tekla Structures (X steel) etc, we can design complex industrial building like office mansion, super market, plants, shipping mall, 5 stars hotel,etc.One-stop service is our outstanding superiority
Q: How about the delivery time?
A: The specific production time depends on the quantity of goods. Normally, it is about 10 to 30 days after all the details are confirmed and receiving the deposit. The delivery of Large order should be discussed with the management department in advance and then confirm the timing with you accordingly.Usually, large order will be delivered in batches.
Q: What about the installation instrucions?
A: We will provide you installation videos and detailed installation instructions or online technical guidance.If you need, we can provide the service of installation guidance arrange a team to do the installation on site by extra.
Q: How about the payment?
A: All payment methods are acceptable. We prefer to 30% down payment by T/T,70% balance before shipment.
