Manual Sealing Non Woven Bag Lace Making Welding Sewing Machine

Price $1588.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 279 people viewed
Quantity
+-
 

Wenzhou Zhuding Machine Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
Y-80
Support
1 Year
Support
1
220V
No
Heat-Sealing Cold-Cutting
Single
Sealing Machine
Non-Computerized
Non-Woven Bag Making Machine
Video Technical Support
Online Support
ZHUDING
Film/Woodcarton
90kg
Zhejiang
Product Description

The machine features :
1 Built-In Computer Chip, Multi-Channel Ultrasonic Protection System, Ensure The Safe And Stable Operation
2 Super Power Output, With Large And Small Three Adjustable Power, Adapt To Different Material, Thickness Of The Welding And Cutting Requirements; 
3 Automatic Tracking System And Ultrasonic Frequency Soft Start Technology Should Be Used, So That The Machine Performance To The International Level; 4 Flowers Die, Style Diversity, Can Provide Design According To Customer Needs; 
5 Operating Speed Is Four Times The Ordinary Sewing Machine, Simple Operation.
 Function
 1 cutting edge: single line or curve resection, and soluble edge treatment, so that no rough edges smooth smoothly, without edges; the
2 suture: two or more layers of fabric stitched together, instead of sewing needles without wireless and weld strength;
3 holes: cut out all kinds of flowers in the hole, and melt edge processing;
4: for a single or multiple of a cut at the same time on the material, and melt edge processing without burr;
5 forming: simultaneous resection, suture, embossing, make a molding of products.
Application:
suitable for making lace dress, ribbon, decorative products, handkerchief, tablecloth, curtain, bedspread, pillow, quilt cover, tent, raincoat, disposable operation clothes, non-woven mask, non-woven etc. 
VOLTAGE220V
OWER1800-2500W
FREQUENCY20KHZ
SPEED0-20m/min
MOULD SIZEWIDTH:0-60mm;  DIAMETER:Ø50-Ø60mm
DIMENSIONL*W*G1200*600*1200mm
WEIGHT90KG
 
 FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)

2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.

3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years guarantee for mechanism, starting from finished installation.

5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.

7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.

8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.

9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA