Manufacturers Fruit Bag Bottom Sealing Plastic Bag HDPE LDPE Film Shopping Bag on Roll with Paper Core Making Machine

Price $45000.00 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 378 people viewed
Quantity
+-
 

Jiangyin Guibao Rubber & Plastics Machinery Co., Ltd.

VIP   Audited Supplier 19 years
Profile Certified by SGS/BV
gbdr
1 Year
Bag Making Machine
2
220V/380V
Flat Bag
High
Yes
Hot Sealing & Perforation
Double
Bag Making Machine
Computerized
Plastic Bag Making Machine
Food Packing Bag
Food Bag
SILSTAR
Stretch Film
Made in China
84778000
Product Description
 

Company Profile

Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.

Product Description


These machines are heat sealing and heat cutting bag making machine, which are suit for printing and non-printing bag making. The material of bag is HDPE, LDPE.

Bag-on-roll with paper&pvc core production. Its automatic film-break and core-change function help bag suppliers to improve bag making capacity and to reduce energy and man power at the most extent.Its double servo motors control system makes producing more stable. It is the best choice for making bottom sealing printed bags and blank bags.
 

 

Product Parameters

ModelGBDR-300*2
Bag Width100mm - 360 mm
Bag Length200mm - 1000 mm
Film thickness10-35µm per layer
Production Speed80-100m/min x2lines
Max. Diameter of rewind roll150mm
Film Unwind DiameterΦ900mm
Total Power13KW
Air consumption5.5HP
Machine Weight3200KG
Machine Dimension6500x2400x2100mm
 

Detailed Photos

 

Certifications

 

Packaging & Shipping

 

Exhibition

FAQ

1. Q: How long will your engineer reach our factory?

A: Within 7-15 days after the machine arrives at your factory.
2. Q: How many days will you finish installing?

A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4. Q: How long is your machine's warranty period?

A: All our machines have one year guarantee, starting from the finished installation.
5. Q: How could we do after one year warranty period?

A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6. Q: How could we do if the parts are broken within the warranty?

A: We would express the free replacement parts during the warranty date.
7. Q: Does your engineer understand English?

A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8. Q: How many workers do we need to run those machines?

A: Usually need one person to operate the machine.
9. Q: How do we solve the machine problem after your engineer leaves?

A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10. Q: How can I visit your company?

A: It takes 30 minutes by train from Shanghai to our factory.

 


 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA