ZZPF
12 Months
Zhengzhuo
China
Product Description
The panel welding process is the bottleneck of membrane wall production, therefore we would commonly see 2 panel welders operating in the same production line. At the end of the first welding pass, the flipping/transverse device will transfer the panel to the second panel welder to begin the back side welding.
Consist of
- The base of the device
- The flipping arms
- Oil cylinder
- Hydraulic station

Consist of
- The base of the device
- The flipping arms
- Oil cylinder
- Hydraulic station
Size | 3500x300x900 |
Weight | 1000KG |
Power | 20KW |
