Metal Parts High Pressure Water Spray Cleaning and Dry Machinery

Price $23584.90 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 388 people viewed
Quantity
+-
 

Wanchuang (Suzhou) Intelligent Industrial Automation Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
VSQH30W2S-3L
Flexible
Flow Production Line
Comprehensive
Parts Production Line
Intelligent Manufacturing
ISO, CE
New
Automatic
Overseas Service Center Available
Six to Seven Years
High Quality
Simple and Convenient
Independent Research and Development Design
Save Energy Consumption and Reduce Environmental P
Machinery Manufactured According to The Needs of C
Vantrn
Steamship
3560*1300*1080
China
8479819000
Product Description

Product Description

Configure 6 rows of high-pressure water spray up and down to wash the workpiece, dilute and clean the surface stains of the workpiece, high-pressure pump circulation spray, spray pipe equipped with pressure gauge, water pressure size can be adjusted,High-pressure water spray automatically spray grinding fluid, degrade grinding particles, reduce grinding temperature, reduce environmental pollution, prevent high-temperature grinding deformation of the workpiece. Achieve grinding fluid recycling, energy saving and environmental protection

Detailed Photos

 

Product Parameters

Transmission speed: 0-6/min (variable frequency)Processing thickness: 1-10mm
Maximum processing width: ≤300mmMinimum processing: 10*20mm (sheet)
Total weight: 4 tTotal power: 35kw
 

Company Profile

FAQ

Q:What is the price of the equipment?
A:According to customer product process needs, machine configuration depends,High equipment configuration, preferential prices, much cheaper than Europe and the United States

Q:What are the features of the equipment?
A:The company independent research and development manufacturing, with complete independent intellectual property rights; The equipment is convenient to operate, simple to maintain, energy saving and environmental protection, stable and durable, and the processing product efficiency is high and the quality is good, and the equipment is upgraded for the metal parts polishing industry.


Q:What is the delivery date of the goods?
A:The delivery time of our products in the peak season is 60 days, and the delivery time of our products in the off-season is about 30 to 45 days.


Q:What packing are the goods to be sent abroad?
A:The delivery time of goods abroad is long, and the wooden frame will be used to package to ensure the quality of the product is intact.

Q:What are the shipping methods supported by the goods?

A:We choose according to the needs of customers, FOB,CIF,CFR and so on.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA