Add: Guanting Industrial Park, Cangzhou City, Hebei, China
Thermal Analysis Cups with Tellurium for iron casting
The thermal analysis cups with tellurium are designed to achieve fast and reliable results from the thermal analysis of iron casting. They have high-precision K-type thermocouples or S type, . The S type is used to measure the carbon content, while the K type measures the cerium content, carbon content, and silicon content in the cast iron.
Principle of measurement:
The collection of temperature curves is conducted by the microprocessor. Contents of carbon and silicon and the quality of molten iron can be calculated by the crystallization process of molten iron.
Cup-CE without tellurium; is used for "Carbon Equivalent" determination of cast iron.
Cup-C with tellurium reliable data for thermal analysis to read CE, C & Si of cast iron.
Cup-HC is specially used for the determination of the high carbon equivalent of cast iron / S.G. Iron.
Product Name: | Carbon cup | Temperature Range: | 1250ºC~1370ºC |
Carbon Equivalent: | 3.2%~4.8%±0.05% | Carbon Content: | 2.8%~4.2%±0.05% |
Silicon Content: | 0.9%~3.0%±0.1% | Type: | Round And Square Type |
Measurement function: | thermal analysis towards cast iron | Measuring time: | 240 seconds at most |
Product And Application
Model | Sensor | Accuracy | Characteristics | Application |
H-3PW | Horizontal | 0.1% F.S | Oblige Chill | Cupola, molten iron of lower temperature, high sensitivity to composition |
H-3PG | Horizontal | 0.1% F.S | Expansion-resistant | Cupola, molten iron of lower temperature, high sensitivity to composition |
H-3QW | Vertical | 0.1% F.S | Oblige Chill | Cupola, molten iron of lower temperature, high sensitivity to composition |
H-3QG | Vertical | 0.1% F.S | Expansion-resistant | Cupola, molten iron of lower temperature, high sensitivity to composition |
H-3QT | Vertical | 0.1% F.S | Oblige Chill | Induction Furnace, molten iron of high temperature and low sensitivity to composition |
H-3GC | Vertical | 0.1% F.S | Oblige deoxidation | Determination of carbon content at the end of oxidation of the steel-making process |
H-3AL | Vertical | 0.1% F.S | Deterioration measurement for Al-Si alloyed melt |
Quality Control:
- All production processes are carried out under the control of the ISO9001 quality management system. During the production process, first, ensure that the ambient temperature and humidity are within the required range. From raw material cutting, slurry forming, blank drying, and sintering, workers in each critical process must In the process of self-inspection of the hole, size, weight, and appearance of the filter, the inspectors regularly conduct random inspections to ensure that defective products do not flow into the next process.
- Production inspection: self-inspection by production workers and regular sampling inspection by full-time inspectors. The finished products are inspected to ensure qualified products flow into customers.
- After-sales service: If damaged during transportation, replenishment will be provided according to the situation. If the product is found to have quality problems during use, after both parties confirm that it is a problem with the filter, our factory will exchange or return the product.
SEFU Measuring C & Si Thermal Analysis Cups Analyzing Carbon Cup Molten Metal Thermal Analysis Carbon Cup for Iron Casting
Shipping
Lead time: 10-15days after signing the contract
Packing
- Inside packing: Filters are put in small boxes and Layered packaging. There is cardboard between each layer.
- Outside packing: Cartons&Pallets. Three-layer corrugated cartons and export special pallets.
- The mark on cartons can be designed according to the customer's request.
Q: Are you Factory?
A: Definitely, we are factory. Welcome to visit us!
Q: What Parameters should I provide to you for proper quotation?
A: Application, pore size, dimension, color, quantity, packing requirements, trade terms.
Q: How can you control your quality?
A: For each production processing, we have complete QC system for the chemical composition and Physical properties. After production, all the goods will be tested, and we have the quality certificates with ISO9001.
Q: What is your lead time?
It usually takes about 15- 20 days after receiving the PO.
Q: Do you provide Samples?
A: Yes, our factory provides samples for testing, pls send detailed parameters to us. (if customized, withdrawing is best) The samples will be charged or free according to the specific requirements.
Q: What are the Payment Terms?
A: We accept T/T, L/C, West Union, etc.
Q: How can I get samples?
A: We are honored to offer you the samples.
Q: What about your Packing?
A: We provide carton boxes, pallets, etc. OEM packing is available too.
Q: Do you have R&D services?
A: Yes, we have an R&D department to assist you in new product development.
Q: Does your company accept customization?
A: We accept OEM service.
Q: Can we visit your company?
A: Yes, for sure, you are welcome to visit our company.