AFK-2088-3
Hotel, Household
Hot & Cold
Stand
Plastic
Electric
Home Hotel Restaurant Office Hospital
1 Year
Electric
550
340*350*1060
Free Spare Parts
Golden
220-240
ABS Plastic
220-240V/50Hz
340*350*1060mm
Standing Water Dispenser
Modern
Standard SS304
9.5/10.5kg
Aofuk
Standard Cardboard Box with Foam
Zhejiang, China
Product Description

Model No. | AFK-2088-3 |
Cooling system | Electeic Cooling |
Color | Gold |
Heating power | 550W |
Cooling power | 75W |
Heating Capacity : | 85~90 5.0L/h |
Cooling Capacity : | 10~15 0.8L/h |
Packaging Dimension : | 340*350*1060mm |
N.W/G.W | 9.5kgs/10.5kgs |
Packing | Standard export carton with peal cotton |
Loading Qty. | 192 pcs/40'HQ |
Materials :
Body material :Toughened glass door and the Plastic Parts Are Made Of Anti-Bacteria ABS Plastic Side plates: 0.5mm galvanized sheet iron
Stainless Steel Welding Water Tank And Copper Tube Ring Cold Tank
_Automatic Thermostate Technology _Over-Current Protection _Type of Anti-Electric-Shock Protection: I
Rated Voltage/Frequency: AC220-240V;50/60Hz
Power Cord(Plug): Europe Type or Other Standard
Three configurations : Warm and hot and cool /Electric Cooling

















REFRIGERATOR VERTICAL WATER DISPENSER RO WATER DISPENSER
DESKTOP WATER DISPENSER TEA BAR MACHINE WATER FILTER




Q1: What is the production time?
A1: 25-30 days after deposit received.
Q2: Can I put my own Logo on machine?
A2: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.
Q3: What's your payment term?
A3: We usually accpet T/T as the main payment term,and other payments can also be negotiated.
Q4: What's the delivery time ?
A4: It's OEM ,so usually takes about 7-15 working days to produce the products.
Q2: Can I put my own Logo on machine?
A2: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.
Q3: What's your payment term?
A3: We usually accpet T/T as the main payment term,and other payments can also be negotiated.
Q4: What's the delivery time ?
A4: It's OEM ,so usually takes about 7-15 working days to produce the products.
Q5:What about the lead time for mass production ?
A5 : Honestly ,it depends on the order quantity and your specific requirements of products.