ZWY-50/60/70/80
a Year
Backhoe Loader
Mining Excavator
Grab Shovel
Hydraulic Transmission
Electric Drive
50
ISO9001: 2000
hongtu
Cabinet or Loose Parts
50
China
Product Description
Hongtu Machinery
One-Stop Purchase of Equipment and Accessories
Save the Hassle
No Need to Run Around

Hongtu Machinery Has It All
Various models and styles of mucking loaders, electric locomotives, rock loaders, mine cars, and related supporting power devices, chargers, motors, speed controllers, plug connectors, signal lamps, automatic switches, pantographs, mechanical parts, and a full range of products-allowing you to complete your procurement in one step with ease.
Genuine Source Supplier
Factory Direct Sales at Low Prices
Products are self-produced and sold directly, adhering to the business philosophy of 'High Quality, Low Profit, Fast Turnover.' Delivered to customers at factory prices with no middlemen driving up costs-saving money.
Ample Stock and Convenient Logistics
he company owns large warehouses with ample stock of standard products. Once you place an order, we ship immediately. Except for remote areas, logistics can deliver directly, saving valuable time for your usage or repairs-saving time.
Mining excavator loader, also known as scraper, tunnel cleaning machine, and tunnel slag removal machine. According to the walking mode, it can be divided into wheeled and tracked types. It has five functions including hydraulic walking, excavation device, belt conveyor, loading, and cleaning the bottom of the tunnel. It mainly consists of an electric motor, hydraulic walking, excavation device, walking device, belt conveyor unloading, and electrical control system. The hydraulic system of the entire vehicle is powered by a 15kW electric motor to drive a gear pump. The hydraulic oil flows from the oil tank to the multi way valve, then to the actuating element and back to the oil tank. The hydraulic device is controlled through the four handles of the multi way valve. Its outstanding advantages are flexible operation and high slag removal efficiency. Taking a 2m * 2m roadway as an example, a row of cannons can be cleaned up in about an hour.



One-Stop Purchase of Equipment and Accessories
Save the Hassle
No Need to Run Around

Hongtu Machinery Has It All
Various models and styles of mucking loaders, electric locomotives, rock loaders, mine cars, and related supporting power devices, chargers, motors, speed controllers, plug connectors, signal lamps, automatic switches, pantographs, mechanical parts, and a full range of products-allowing you to complete your procurement in one step with ease.
Genuine Source Supplier
Factory Direct Sales at Low Prices
Products are self-produced and sold directly, adhering to the business philosophy of 'High Quality, Low Profit, Fast Turnover.' Delivered to customers at factory prices with no middlemen driving up costs-saving money.
Ample Stock and Convenient Logistics
he company owns large warehouses with ample stock of standard products. Once you place an order, we ship immediately. Except for remote areas, logistics can deliver directly, saving valuable time for your usage or repairs-saving time.
Mining excavator loader, also known as scraper, tunnel cleaning machine, and tunnel slag removal machine. According to the walking mode, it can be divided into wheeled and tracked types. It has five functions including hydraulic walking, excavation device, belt conveyor, loading, and cleaning the bottom of the tunnel. It mainly consists of an electric motor, hydraulic walking, excavation device, walking device, belt conveyor unloading, and electrical control system. The hydraulic system of the entire vehicle is powered by a 15kW electric motor to drive a gear pump. The hydraulic oil flows from the oil tank to the multi way valve, then to the actuating element and back to the oil tank. The hydraulic device is controlled through the four handles of the multi way valve. Its outstanding advantages are flexible operation and high slag removal efficiency. Taking a 2m * 2m roadway as an example, a row of cannons can be cleaned up in about an hour.

project
Unit parameters
project | unit | parameter | ||||
ZWY-50 | ZWY-60 | ZWY-70 | ZWY-80 | ZWY-100 | ||
length | mm | 4300 | 4300 | 5600 | 6000 | 6400 |
width | 1300 | 1500 | 1700 | 1700 | 1730 | |
height | 1500 | 1500 | 1500 | 1770 | 1650 | |
wheelbase | 1300 | 1500 | 1700 | 1700 | 1700 | |
Maximum Mineral Material | 450*550 | 450*550 | 450*550 | 450*550 | 450*550 | |
Ground clearance | 180 | 180 | 180 | 160 | 190 | |
weight | Kg | -3800 | - | - | - | - |
Maximum lifting height | mm | 1350 | 1350 | 2100 | 2100 | 2100 |
Loading height of material rack | 1200 | 1200 | 1500 | 1600 | 1500 | |
Suitable length for loading | 1500 | 1500 | 1700-2200 | 1750-2100 | 1700-2100 | |
Bucket lifting height | 2000 | 2100 | 1900 | 1800 | 1740 | |
total power | kw | 15 | 15 | 15 | 19 | 19 |
Rotation | ° | 73 | 73 | 73 | 73 | 73 |
Maximum driving speed | Km/h | 3/6 | 3/6 | 3/6 | 3/6 | 3/6 |
Maximum excavating force | Kn | 11.1 | 11.1 | 11.1 | 11.1 | 11.1 |
load efficiency | t/h | 50 | 60 | 70 | 80 | 100 |
belt width | mm | 500 | 600 | 600 | 700 | 700 |
Maximum Gradient | ° | 22 | 22 | 24 | 24 | 24 |
Working space | M | 1.5*1.8 | 1.5*1.8 | 1.8*2.2 | 2.6*2.6 | 3*3 |


