PRODUCT DESCRIPTION
Powder coatings are mixed with a certain proportion of the resin, fillers, curing agents and other additives, and then prepared by hot extrusion, crushed and sieved. The products are stable at room temperature storage, and then baking heat melted and solidified to form a smooth and bright permanent coating to achieve the purpose of decoration and anti-corrosion.


PRODUCT PARAMETERS
Product Details | |
Type | Nano Silver Chrome Effect Epoxy Powder Coating Paint to Replace Electroplating |
Color | metallic |
Surface Finish | smooth |
Gloss level | 500-560% |
Particle Size | Average 32-42μm |
Specific Gravity | 1.2-1.7g per cubic meter |
Coverage | 7-8 square meters per Kg at 60-80 μm film thickness |
film thickness | 60-80um |
Application Recommendation | |
Application Voltage | 60-90 KV |
Gun to Component Distance | 15-30CM |
Curing Temperature | 180-200ºC,10 min-15 min |
Powder coated Film Mechanical Properties | |
Adhesion | Cross-cut(2mm),no loss of adhesion |
Impact Resistance | Direct impact 50kg/cm |
Pencil Hardness | 1H-2H |
Cupping Test | 6mm Mandrel |
Bending Test | 5mm |
Powder Coated Film Chemical Resistance | |
Salt Spray Test | 5% NaCl Solution for 500 hours - No change |
Acid Resistance | 5% HCL for 48 hours dip test - No change |
Alkali Resistance | 5% NaOH for 48 hours dip test - No change |
Storage Stability | |
Store in ventilated, dry, clean room, temperature < 25ºC | |
Relative humidity 50-65% | |
Away from direct sunlight, fire, heat | |
For best performance, use within 6 month |
POWDER TEST
QUALITY CONTROL
- Raw materials: Internal and External Test before taking delivery of every raw material to make sure they are all qualified without any heavy metal substance.
- During Production: Every production has a spray booth, spot check the powder every 1-2 hours to guarantee stable quality.
- Finished Product: The QC keeps 100g from each batch of mass production, so that we could act quickly when we receive feedbacks from our clients and solve the problems efficiently.
- Traceability: Standard Panels for every batch of production for 5 years. Kept sample powder for 24 months.

TECHNICAL SUPPORT

Before: Advice on coating ling setup, integrated solution on coating.
During: Processional production tracking. Punctual delivery.
After: Quality tracking system. Regular follow-up.
PRODUCTION PROCESS
PACKAGE & DELIVERY
CERTIFICATION
WONDER Powder Coatings can pass ROHS, EN71 standards. We can also provide powders with FDA, REACH and other certifications as customers require.



WONDER FACTORIES
2. 4 Factories in total. Three are Powder Coating Production Bases; one is Nano-Dryplating Spraying Base.
16 Production Lines.
5 Bonding Lines.
9 Sample Lines.
Annual Capacity reaches 10,000 Tons.
3. Nano-Dryplating Silver Chrome Effect Powder Coating is identified as Guangdong High-Tech Product.
4. Export to oversea countries: Sweden, Turkey, Russia, US, Central America, Peru, Costa Rica, Pakistan, Kazakhstan, UAE, Vietnam, Thailand, Malaysia etc.

FAQ
Q: Can I have a sample order for Powder Coating?
A : Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q: What about the lead time?
A: Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than 10 tons, needs about 20 week days.
Q: Do you have any MOQ limit for powder coating order?
A: Low MOQ, 1kg for sample checking is available
Q: How to proceed an order for powder coating?
A : Firstly let us know your requirements or application(For indoor or outdoor use). Secondly We quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly We arrange the production.
Q: Is it OK to print my logo on package?
A : Yes. Please inform us formally before our production and confirm the design firstly based on our sample.