CSM-8
Engineer Installs, Debugs and Video Instruction
3 Years
New
ISO 9001:2008, GB/T19001-2008
Automatic
Recycled Material, Paper
Normal Specification Paper
Max 2000mm
80 M/Min
Ivory White or Grey
300-2400mm
1-2mm
380V
PLC
Dinghao
Film Wrapping, Oiled and Tray;
Single-slitter
Dongguang
8441309000
Product Description

Another option for Single Corrugation Cardboard Production Line is the Sheet Cutter Machine.
It has a PLC system and a touch screen that displays the production and operation menus.
For consistent operation and small paper waste, the transmission section uses frequency motor and servo drive.
The precision of the cutting length is less than 1.5mm.
It has a PLC system and a touch screen that displays the production and operation menus.
For consistent operation and small paper waste, the transmission section uses frequency motor and servo drive.
The precision of the cutting length is less than 1.5mm.
Parameter/Model | Unit | 1700-Model | 2000-Model(for reference) |
Max Cutting width | mm | 1600 | 1900 |
Cutting Length Range | mm | 300--2400 | 300--2400 |
Cutting Thickness | mm | 1--2 | 1-2 |
Control Voltage | VAC | 220 | 220 |
Power Voltage | VAC | 380 | 380 |
Distribution Capacity | kw | 6 | 6 |
Running Speed | m/min | 80 | 80 |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
1. Are you manufacturer or trading company?
We are a combination of manufacturer and trading company.
We usually accept T/T. DP and LC are also ok for us.
We need 30% payment as deposit to arrange production and the balance should be paid before shipping.
3. What is your leading time on average? How much time is needed for installation?
The manufacturing period for Sheet Cutter with Belt Stacker is 45 days since deposit is received and installation period is around 14 days.
4. How do we install and debug machine?
Engineer guides installation and debugs machine via video or on site.
5. Where is factory? How can we visit there?
Factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
It is near Beijing and Tianjin, so after you get to Beijing or Tianjin airport, we will pick you up and take you to factory