New Generation Underground Works Truck, Mounted Drilling Rig, Intelligent Arch Anchor Trolley, Underground Rock Drilling Machine

Price $1.00 Compare
Min Order 1 Piece
Shipping From Sichuan, China
Popularity 373 people viewed
Quantity
+-
 

Sichuan Lanhai Intelligent Equipment Manufacturing Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
LGM312N
1 Year
CE, RoHS, ISO 9001:2000, ISO 9001:2008
Impactor
41~102mm
4m
Anchor Drilling
38t
138.5kw (National IV)
159kw
380V
17×12m
Bidirectional Driving (Front and Rear Dual Cabs)
Four-Wheel Drive, Four-Wheel Steering
380mm
36%
15m (Two Wheels)/ 8m (Four Wheels)
LANHI
Nothing
11360*3665*3355mm
China
Product Description
Product Description

The LGM312N intelligent integrated arch anchor trolley adopts an engineering chassis and is equipped with a dual anchor system. The machine features four-wheel steering, four-wheel drive, two-way driving and other functions. Its diesel-electric dual power system supports electric construction and diesel-powered emergency operations. The three- arm remote control can meet the requirements for prefabricated arch frame installation, operation of various benching methods and precise positioning adjustment of the arch frame. The arch frame can handle under-excavation and welding operations during installation, and the tunnel itself is very flexible.

Functional integration: The intelligent integrated arch anchor trolley combines multiple processes into one, including measuring and placing points, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, anchor grouting (optional), and many more.

Equipment digitization(Optional): including cluster management, positioning function, video surveillance, walkie-talkie function, pre/alarm function,data management function, tunnel BIM technology and digital twin, construction report
management, tunnel contour scanning, remote control and other functions.

High efficiency: Featuring a three-arm,three-gripper and three-basket structure. The maximum lifting force of the middle arm is 3 tons. The entire construction process takes about an hour.

Installation of prefabricated arch frames: Our company's patented multi-frame prefabricated segmented assembly and multi-frame prefabricated folding arch frame installation techniques are used to produce the arch frames outside the tunnel. This reduces the required working time on dangerous surfaces and construction safety risks, and greatly improves overall efficiency.

Dual anchor system: The maximum drilling depth reaches 4.5m, and the left and right arm frames can perform feet locking, system anchoring and advance anchoring operations at the same time.

Rotating deployable hanging basket: The equipment is equipped with a rotating hanging basket, which features a larger operating space that can be used to install explosives and anchor rods.

Optional grouting function: The equipment is equipped with an optional grouting system, allowing grouting operations to be quickly performed after the anchor has been installed.
   
Less operating personnel: The entire construction operation can be completed by only 3-4 people, where traditional operations would require 8 or more.
 
Auxiliary function integration: The equipment comes with a breaker hammer and welding machine, which can perform under-excavation processing and welding operations when the arch is installed.

Product Parameters
Transport dimensions (L × W × H)11360×3665×3355mm
Total weight38t
Engine power138.5kW (National IV)
Installed electrical power159kW
Operating modeElectric construction + diesel-powered walking and emergency
Control modeWireless remote control + manual control
Operating voltage380V
Operating range (width × height)17×12m
Chassis formOperating chassis
Driving modeBidirectional driving (front and rear dual cabs)
Driving and steering methodsFour-wheel drive, four-wheel steering
Minimum ground clearance380mm
Maximum grade36%
Turning radius15m (two wheels)/ 8m (four wheels)
Maximum speed15km/h
Approach angle/departure angle15.4°/15.7°
Arm support modeTwo stage telescopic
Arm support quantity   3
Hanging basket modeExpandable
Number of hanging baskets3
Number of grippers3
Maximum lifting capacity of middle arm3t
Maximum lifting capacity of left and right arms1.5t
Number of rock drills2
Power of rock drills18kW
Advance beam5590mm(6200/4990mm)
Drill Pipe4305mm(4915/3700mm)
Maximum drilling depth4m(4.6m/3.4m)
Drilling diameterΦ41~Φ102mm
Discharge volume0.98m³/min
Discharge pressure0.8MPa
Flow rate16m³/h
Pressure20bar
Welding machines3 sets
Breaking hammers2 sets
Grouting systemOptions
Three remote controls/one remote controlUnidirectional driving
BreakerFront wheel steering
Electric Welding MachineCombustible Gas Detector
Middle arm bearing capacity of 1.5tHole cleaning device
Grouting system 
Detailed Photos

FAQ

1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.

2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.

3,What payment terms do you accept?
We accept T/T with a 50% prepayment.

4,What about the order lead time?
The usual lead time is 15 days.

5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.

6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.

7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA