0.5Ton - 50Ton Johkasou Treatment Wastewater AAO Biological Treatment Process Sewage Treatment Equipment for Residential Hospital
PP integrated sewage treatment equipment is named after the raw material and is a polymer and new material equipment. Since the equipment made of this material is integrally molded, it is presented as a tank. Based on the tank form, the R&D team of New Yuda overcomes difficulties, improves technology in west countries, and develops a series of integrated sewage treatment

PP integrated sewage treatment equipment adopts A2/O process, which ensures the removal effect of COD, ammonia nitrogen, total nitrogen and also strengthens the removal effect of phosphorus.SMC sewage treatment tank adopts biological process, where microorganisms mainly grow on spherical filler media, which can achieve the separation of hydraulic retention time and sludge retention time, and help to enrich the specialized functional microorganisms which have a long generation time and a good treatment effect, and the biological is microbial aggregation with certain thickness, and compared with activated sludge method, biofilm method is more resistant to shock load and the operation of the equipment is more stable. PP integrated sewage treatment equipment adopts the design concept of low volumetric loading, and the hydraulic retention time is more than 24 hours, which helps to increase the microbial self-oxidizing ability, and improves the quality of the effluent while reducing the production of residual sludge, and reduces the cost of sludge treatment and the cost of construction of sludge tanks. PP integrated sewage treatment equipment is simple and unmanned operation, the use of Internet of Things technology can realize remote mobile management to save operation and maintenance labor costs.

A²O Process Schematic Diagram
(1) Anaerobic, anoxic, and aerobic, the combination of three different environmental conditions and microbial communities are capable of simultaneously removing organic matter and nitrogen and phosphorus.
(2) In the process of simultaneous deoxygenation, phosphorus removal, and organic matter removal, this process flow is the simplest, and the total hydraulic retention time is also less than other similar processes.
(3) Under the alternating environmental of anaerobic, anoxic and aerobic, filamentous bacteria do not reproduce in large numbers, and the SVI is generally less than 100, so sludge expansion does not occur.
(4) The phosphorus content in sludge is high, generally above 2.5%.
2.PP integrated sewage treatment equipment Specifications
Purification Tank | Details Sepcification |
Capacity | 2T/D |
Size | 2130x1150x1650mmmm |
Weight | 200kg |
Thickness | 15mm |
Raw material | PP |
Included system | Including equipment body, packing, aeration system, reflow system, etc. |
3.PP integrated sewage treatment equipment project cases
4.Features of Sewage Treatment Equipment
product quality is stable and guaranteed.
(2)The raw material used imported resin, which has high structural strength and corrosion resistance, and can be used stably for 30 years underground.
(3)The unique patented water distribution system is adopted to ensure that there is no dead angle and short flow in the
purification tank system, and the effective volume is large.
(4)Adopt patented filler compound combination technology to provide a reliable growth environment for microbial growth
(5)Supporting bio-enhanced denitrification and phosphorus removal bacteria, the system starts quickly, has strong shock load resistance and less sludge.
(6)Simple installation, convenient operation, small maintenance workload, remote operation and control system
(7)Adopt patented surface corrugated reinforcement design technology, high structural strength, can be used in the northern thick frozen soil environment











A) How could I get a sample?
Sample are available, but please afford sample costs and express fee.
B) Sample lead time?
Existing items: Within 7-10 days.
C) Do you offer OEM service and marked our logo on the products?
Yes, We offer OEM services.
D) What is the delivery time?
Normally, delivery time is 20-30days after order.
E) How to guarantee the quality of your products?
1) We have strict quality control system, every product has been strictly inspect and stamped QC psssed before shipping out.
2) Strict sampling inspection on products before shipment and intact product packaging ensured.