Green Formwork System - Panel-Prop Early Stripping System
Introducing the innovative Green Formwork System by Shandong Prima Construction Formwork Co., Ltd. This system is designed based on the principles of Green Construction, offering a sustainable solution for construction projects.
The Panel-Prop early stripping mechanism allows for efficient erection, stripping, and removal, ensuring high productivity and safety. This system is a puzzle-style design, making it the most advanced Early Stripping System globally.
The Green Formwork System consists of three key components:
- Panel with plywood facing on a steel frame
- Prop with early stripping mechanism
- Assembly/Disassembly Tool
With the Green Formwork System, braces are not required, simplifying the construction process and enhancing efficiency.
Item | Item | specification | unit weight |
Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
MB189 | 1.8X0.9M | 37 | |
MB186 | 1.8X0.6M | 29 | |
MB1512 | 1.5X1.2M | 39.4 | |
MB159 | 1.5X0.9M | 31.3 | |
MB156 | 1.5X0.6M | 23.8 | |
MB1212 | 1.2X1.2M | 32 | |
MB129 | 1.2X0.9M | 26 | |
MB126 | 1.2X0.6M | 21 | |
MB99 | 0.9X0.9M | 21 | |
MB96 | 0.9X0.6M | 17 | |
MB66 | 0.6X0.6M | 12.3 |

Green Formwork by Shandong Prima Construction Formwork Co., Ltd.
Our Green Formwork, developed with patented technology from Canada's "TABLA," features a drop head mechanism making it the most advanced, safest (6-directions fixed), and fastest slab formwork globally. This innovative product is patented in the USA, Australia, China, Malaysia, and more, offering unbeatable advantages:
- SAFE: The independent table with 6-direction moving restriction ensures exceptional stability.
- EFFICIENT: With minimal components, easy set-up, and removal, the early stripping mechanism accelerates construction, achieving an erection speed of 60-100 square meters per person per day.
- REDUCED TOTAL COST: The early stripping mechanism reduces the number of panels, cutting costs in transportation and storage.
- MINIMUM OPERATORS: A team of 3-4 workers can swiftly install and remove the panels.


Welcome to Shandong Prima Construction Formwork Co., Ltd.
As the leading manufacturer and supplier of scaffolding and formwork systems in China, we pride ourselves on our advanced production capabilities. Our scaffolding couplers/clamps meet BS1139(1982&1991) and EN74/EN74B standards, ensuring top-notch quality comparable to products made in the U.K. at a more competitive price.
Since 1993, we have been supplying the U.K. market and exporting to various European countries, Canada, U.S.A., Brazil, Australia, and New Zealand. Our products are trusted globally in construction, power stations, petrochemical industries, and more.
With official certifications from the U.K. and Australia, we offer a wide range of scaffolding couplers/clamps, including forged, pressed, and cast carbon steel products. Our inventory also includes Ring system scaffolds, cup-lock system scaffolds, Kwikstage system scaffolds, Euro system scaffolds, scaffold frames, screw base jacks, formwork accessories, and construction tools.
Introducing our patented Green Formwork, featuring technology from Canada's "TABLA" with a drop head mechanism. This innovative product is the most advanced, safest (6-directions fixed), and fastest slab formwork globally, with patents in the USA, Australia, China, Malaysia, and more.
Experience the excellence of Shandong Prima Construction Formwork Co., Ltd. for all your scaffolding, construction, and formwork needs.





