MK-MM2028
Flexible
Flow Production Line
Comprehensive
Product Line
Intelligent Manufacturing
ISO, CE
New
Automatic
1 Year
Markevina or OEM
Wooden Case
Customized
China
Product Description
Orthopedics Plaster Bandage Production Line,
Gauze Cohesive Bandage Machine Equipment Customized
Plaster of paris bandage production supporting instructions:
1. Plant area: 1800 square meters About ; 1 , production line 960 (60 × 16m)
2 , cutting workshop 62.4 ( 9.6 × 6.5m )
3 , Packaging workshop 92.16 ( 9.6 × 9.6m )
Two, a transformer of 150KW or more
3. Packaging supporting equipment: one air compressor, two sealing machines, one packing machine, price: 13000 Yuan
4. Main raw materials and prices: 1 , Plaster of Paris 1200/t
2 , cotton gauze 1.22/m
3 , Maltodextrin 5800/t
4 , Latex 8300/t
5 , Methanol 3500/t
5. Packaging accessories and prices : 1 , composite bag 3.10/
2 , Ziplock bag 21/kg
3 , cubic bag 19/kg
4 , bakelite core 18/kg
5 , packing belt 13/kg ( 10kg/ roll, width 11.5mm _ thickness 0.8mm)
6 , adhesive tape 7.8/ piece ( 4.5cm X 200 code)
Six, production line capacity: per minute 20m about eight hours 9600m about.
7. Staffing 16 People: 1 , production line 6 people
2 ,Divide 2 people
3 , packing two groups of 8 people
Equipment list








Gauze Cohesive Bandage Machine Equipment Customized
Plaster of paris bandage production supporting instructions:
1. Plant area: 1800 square meters About ; 1 , production line 960 (60 × 16m)
2 , cutting workshop 62.4 ( 9.6 × 6.5m )
3 , Packaging workshop 92.16 ( 9.6 × 9.6m )
Two, a transformer of 150KW or more
3. Packaging supporting equipment: one air compressor, two sealing machines, one packing machine, price: 13000 Yuan
4. Main raw materials and prices: 1 , Plaster of Paris 1200/t
2 , cotton gauze 1.22/m
3 , Maltodextrin 5800/t
4 , Latex 8300/t
5 , Methanol 3500/t
5. Packaging accessories and prices : 1 , composite bag 3.10/
2 , Ziplock bag 21/kg
3 , cubic bag 19/kg
4 , bakelite core 18/kg
5 , packing belt 13/kg ( 10kg/ roll, width 11.5mm _ thickness 0.8mm)
6 , adhesive tape 7.8/ piece ( 4.5cm X 200 code)
Six, production line capacity: per minute 20m about eight hours 9600m about.
7. Staffing 16 People: 1 , production line 6 people
2 ,Divide 2 people
3 , packing two groups of 8 people
Equipment list
No _ | project | Q ty | Remark |
1 | Styling machine | 1 | Combined setting machine 8 sections oven |
2 | Machine Tail Part | 1 | Bandage Machine Tail Part |
3 | Machine head Part | 1 | of machine head, two sets of transmission pipes and two sets of stirring |
4 | Heat conduction oil boiler | 1 | 10m spacing pipes, valves |
5 | Slitting machine (two sets ) | 2 | Each slitter belt 20 Secondary slitting knife, without air compressor and air tank |







