ZD-SPL-90/33/1000
Support
1 Year
PP Tape
PP
Granulating Extruder
One Feed
Single-Screw
Exhaust
Automatic
Non-Computerized
110mm
20:1
600
10-55
0.025-0.08
30-70kg/H
zhuding
Wooden
2200KG
Zhejiang
Product Description



Item\Type | ZD-FS 110/ 600B | ZD-FS 110/ 700B | ZD-FS 110/ 800B | ZD-FS 120/ 1000B | ZD-FS 120/ 1200B | ZD-FS 135/ 1600B | ZD-FS 135/ 1800B | ZD-FS 140/ 2000B | ZD-FS 140/ 2200B |
diameter of screw | 110 | 110 | 110 | 120 | 120 | 135 | 135 | 140 | 140 |
length:diamete r(screw) | 23:1 | 23:1 | 24:1 | 23:1 | 23:1 | 26:1 | 26:1 | 26:1 | 26:1 |
rotary speed of screw(r/min) | 25-75 | 25-75 | 25-75 | 23-70 | 23-70 | 22-65 | 22-65 | 20-60 | 20-60 |
motor power of extruder(kw) | 22 | 22 | 30 | 30 | 30 | 37 | 37 | 45 | 45 |
heating power of extruder(kw) | 33 | 34 | 36 | 43 | 47 | 77 | 80 | 86 | 92 |
width of die(mm) | 600 | 700 | 800 | 1000 | 1200 | 1600 | 1800 | 2000 | 2200 |
number of oven | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
power of driving motor(kw) | 5.5 | 5.5 | 7.5 | 7.5 | 7.5 | 11 | 11 | 11 | 11 |
heating power of the oven(kw) | 15 | 15 | 15 | 20 | 24 | 30 | 30 | 30 | 30 |
thickness of tape(mm) | 0.025-0.08 | 0.025-0.08 | 0.025-0.08 | 0.025-0.08 | 0.025-0.08 | 0.03-0.08 | 0.03-0.08 | 0.03-0.08 | 0.03-0.08 |
prodrction capacity(kg/h) | 30-70 | 40-80 | 50-100 | 60-120 | 70-140 | 90-180 | 100-200 | 110-220 | 120-240 |
drawing speed (m/min) | 50-150 | 50-150 | 50-150 | 50-150 | 50-150 | 50-150 | 50-150 | 50-150 | 50-150 |
drawing rate | 4-8 | 4-8 | 4-8 | 4-8 | 4-8 | 4-8 | 4-8 | 4-8 | 4-8 |
weight(kg) | 5000 | 5500 | 6500 | 7500 | 8500 | 10000 | 11000 | 12000 | 13000 |
installing dimensions L×W×H | 13300 ×1250 ×1260 | 13300 ×1350 ×1260 | 13300 ×1500 ×1350 | 14700 ×1750 ×1400 | 16500 ×2050 ×1450 | 17200 ×2600 ×1450 | 19000 ×2950 ×1450 | 19200 ×3400 ×1450 | 19200 ×3500 ×1450 |




1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years
guarantee for mechanism, starting from finished installation.
5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay
salary for our technicians 80USD/day for each person.
7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.
9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.