GBDS
1 Year
220V/380V
High
No
Double
Bag Making Machine
Computerized
Plastic Bag Making Machine
Pet Poop Bag
Made in Taiwan
Engineers Available to Service Machinery Overseas
Made in China
Automatic
One Time
Competitive
HDPE,LDPE,etc.
According to Client's Requirements
6kw
SILSTAR
Wrapping Film Packing or Packed in Wooden Case
CE, ISO9001: 2008, SGS, TUV
China Mainland(Jiangyin)
84778000
Product Description
Plastic pet bag machine
specially designed for producing plastic waste bag, pet bags, dog poop bags, doggy bag, and dog pooper scooper bags. The machine adopts servo motors control which is suitable for producing LDPE, HDPE, and biodegradable materials with printed logo or non- printed logo because of the photocell equipped.
Plastic film go through procedures are film unwinder first and then heat seal by heating copper knife, then there will be two times fold function to make it smaller width, then for perforating with teeth cutting blade. Film will go through several aluminum rolls to make folded film flat and event before rewinding. Automatic paper core change with plastic tape stick on rolls. This is the whole procedure to produce pet poop bags. HIGH SEA automatic machine will increase production capacity and stability.
specially designed for producing plastic waste bag, pet bags, dog poop bags, doggy bag, and dog pooper scooper bags. The machine adopts servo motors control which is suitable for producing LDPE, HDPE, and biodegradable materials with printed logo or non- printed logo because of the photocell equipped.
Plastic film go through procedures are film unwinder first and then heat seal by heating copper knife, then there will be two times fold function to make it smaller width, then for perforating with teeth cutting blade. Film will go through several aluminum rolls to make folded film flat and event before rewinding. Automatic paper core change with plastic tape stick on rolls. This is the whole procedure to produce pet poop bags. HIGH SEA automatic machine will increase production capacity and stability.

Model | GBDR-400 |
Production Line | 1 Line |
Max. Bag Roll Width | 60mm |
Ma.x Bag Width | 240mm |
Bag Length | 200 - 800 mm |
Film thickness | 7-35 micron per layer |
Production Speed | 100 meter/min |
Paper Core Diameter | Φ8mm |
Film Unwinder Diameter | Φ900mm |
Total Power | 10KW |
Air consumption | 1HP |
Machine Weight | 1500KG |
Machine Dimension | L8000*W1000*H1800mm |






Other machine you may interested:
1.Film blowing machine
2.Coreless Bag making machine
3.Bag with Core making machine
4.Recycle machine

Silstar machinery founded in 1997, covers an area of 32,000 m2,we focused on film blowing machine, bag making machines for plastic bag and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
SILSTAR Workshop Pictures:





1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |