
Introdution:

Technical Data:
Main technical parameters | ubm-120 | |
Encasing speed | 30-120cartons/min | |
Carton | Quality requirement | 250-350g/m2 |
Dimension range(L*W*H) | (65-125) *(30-85) *(12-50)mm | |
Leaflet | Quality requirement | 60-70g/ m2 |
Unfolded leaflet specification | (80-250) *(90-170)mm | |
Fold range | 1-4 fold | |
Compressed air | Working pressure | ≥0.6mpa |
Air consumption | 120-160L/min | |
Power supply | 220V 50HZ | |
Motor power | 0.75Kw | |
Machine dimension(L*W*H) | 2150*1140*1800mm | |
Machine weight | 1100kg |
Features:
- Conforms to cGMP standards CE Marked
- With the feeding device for blister and
- International famous brand of electrical component such as PLC touch screen, frequency inverters, etc.
- Adopt human-machine operation system.
- When machine is overload, it will automatically stopped.
- It will automatically reject lacking of package product and leaflet.
- It will automatically display trouble, Alarm and count finished products.
- Fully adjustable throughout size range with digital position indicators
- Stable performance, operation is easy.
1.Capsule Polishing Machine 2.Tablet Press 3.Blister Packing Machine
4.Capsule&Tablet&Pill&Gummy Counting Machine
5.Powder Mixer Machine 6.Strip Packing Machine 7.Box Packing Machine
Pre-sale service
1. Support product customization, any requirements you need can be customized according to your requirements.
2. Sample test on our machine.
3. Provide business consulting and technical support, as well as a free professional packaging solution
4. Make a machine layout for customers based on customers' factories.
After-sales service
1. Manual book.
2. Videos of installation, adjusting, setting, and maintenance, are available for you.
3. Online support, or face-to-face online communications, are available.
4. The engineer overseas services, are available. The tickets, visa, traffic, living, and eating, are for customers.
5. During the warranty year, without human-being broken, we will replace a new one for you.
Q1:Are you manufacturer or trading company?
A1: We are manufacturer with own factory and exporting department.
A2: Normally it's about 30~45 working days.
Q3: What's the payment terms?
A3: 30% deposit TT, 70% paid before shipment; or L/C, Western Union.
Q4: Can we check machine before order?
A4: Yes, welcome to visit our factory and check machine anytime.
Q5: Is it difficult to install the machine ?
Q5: For standard small machines, the machines will be packed with no take apart, it comes to you to be a complete machine; you
just need to connect power and compressed air to machine, then begin to operate the machine.
For large size machines, we will take the machine apart, on condition that we do our best to keep the machine easy to assembly.
You will get videos and instructions about installation of machine from us.
Q6: Does the machine power voltage meet buyers' factory power source?
A6: We can do it as your request.