pig slaughter machine-1107001
7*24hours
Goose, Duck, Chicken, Quail Pigeon
220/380/440V
Automatic
New
5years
Safe and Durable
100-10000bph
Engineer Installation
CE SGS Soncap Etcs
Automatic Slaughter Line
90s
60s
45min
Yuechen
Export Standard Packing
Customzation
China
8438500000
Product Description



ITEM | EQUIPMENT | QTY | UNIT | REMARK |
1 | Motorized Pig Restrainer | 1 | set | The rack is in Hot dip galvanized |
2 | Electrical Stunning Tool | 1 | set | Shell spray, regulating range 70-90V |
3 | Automatic bleeding tunnel | 45 | M | Including rotary device, rail, removable chain, carriage and connectors ,all of are in hot dip galvanized material. Hanging distance:1200mm. |
4 | Drive unit | 1 | set | Hot dip galvanized ,Frequency Control Motor |
5 | Tension device | 1 | set | Hot dip galvanized, Mechanical Tension |
6 | Buckle foot device | 50 | stick | Hot dip galvanized |
7 | Vertical Pig washing machine | 1 | set | The rack is hot dip galvanized, stainless steel shell. S |
8 | Automatically unload device | 1 | set | The rack is hot dip galvanized. |
9 | Manual limit brake | 1 | set | The rack is hot dip galvanized |
10 | Carcass lifting conveyor | 1 | set | The rack is hot dip galvanized ,Including electric control box |
11 | Scalding and hair removing unit | 1 | set | The rack is hot dip galvanized |
12 | Dressing conveyor | 1 | set | The rack is hot dip galvanized, flange and panels are stainless steel. Stainless steel: 304 |
13 | Carcass automatic processing line | 35 | M | Including rotary device, rail beam Hanger, carriage, removable chain, track, orbit switch, curved track and connectors, etc., are hot galvanized structure |
14 | Drive unit | 1 | set | Hot dip galvanized,Frequency Control Motor |
15 | Tension device | 1 | set | Hot dip galvanized,Mechanical Tension |
16 | Synchronous sanitation inspection(16 plates) | 1 | set | With driver, tension, rotary, rail, removable chain, carriage are hot galvanized material.Inspection plate and hooks are stainless steel, plate distance: 1200mm, stainless steel: 304. |
17 | Offal slide tunnel | 2 | piece | stainless steel: 304. |
18 | Bridge spliting saw | 1 | set | The rack hot galvanized, V,U shaped groove and shell are stainless steel. |
19 | Vertical speed up machine | 1 | set | The rack hot dip galvanized |
20 | Reciprocating half split Saw | 1 | set | Including pulleys and other accessories, without weights, stainless steel shields, stainless steel: 304. |
21 | On Line Weighing Scale | 1 | set | 300Kg,Including screen, printing device |
22 | Pushing-track line in slaughtering workshop | 88 | M | Including rail beams, hangers,rail, orbit Switch, curved track and connections,all of these are hot galvanized structure. |
23 | Double pulley | 300 | piece | Hot galvanized |
24 | Fork block | 300 | piece | Stainless steel |
25 | Acid discharging dual push line in chilling room | 66 | M | Including rail beams, hangers,rail, orbit Switch, curved track and connections,all of these are hot galvanized structure. |




We have 40years history .more than 30engineering and technical personal ,Various production and testing equipment readily available .The company passed ISO9001, SGS,SONCAP,CE certification, product quality has been unanimously recognized.
We always adhere to the people-oriented scientific and technological innovation to meet customer needs, quality service as the basis, mutual win-win as the goal!


Q1:Are you a trading company or a factory?
A1:We are a manufacturer, and our company has the right to import and export all kinds of goods.
Professional poultry slaughter manufacturer since 1980.
Professional poultry slaughter manufacturer since 1980.
Q2:Which countries do you sell to?
A2:The United States is our largest market. Many of our customers are traders from the United States, but most of the equipment they buy is exported to developing countries - Southeast Asia.
Q3:Are your products HALAL?
A3:Our products are not all HALAL products. We have exclusive products customized for HALAL according to the HALAL slaughtering way.
Q4:What about the delivery time?
A4:The delivery time is usually 20-30 working days.
Q5:What are your terms of payment?
A5:Generally need to pay a deposit of 30% and pay the balance payment before shipment. L/C,T/T, cash, Western Union.