Poor Boy Degasser for Oilfield Equipment Vertical Mud Gas Liquid Sludge Centrifuge Separator

Price $31000.00 Compare
Min Order 1 Piece
Shipping From Shaanxi, China
Popularity 314 people viewed
Quantity
+-
 

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
ZCNQF-800/1.5
24/7
1 Year
ISO 9001:2000, ISO 9001:2008
Electric
Alloy
Liquid Gas Separator
180-320
0.8-2.5
800-1200
125-200
zhongcheng
Pallet or Wooden Case
China
Product Description
Degassor for Oilfield Equipment  Vertical Mud Gas  liquid sludge  Centrifuge  Separator


Product Description

 
Mud/Gas Separator is a piece of special equipment for degassing gas-invaded mud in the first grade. It is mainly used to remove big bubbles above φ3mm in diameter and these bubbles refer to expanded gases in the fluids that fill in some parts of well annulus. Well kick even spilling out to the rotary table will easily occur if they are not removed.

Spec
 
ModelZCNQF-800/1.5ZCNQF-1000/2.5ZCNQF-1200/2.5
Capacity180m3/h240m3/h320m3/h
Main body Diameter800mm1000mm1200mm
Working pressure: Mpa0.8/1.51.5/2.52.5
Main body Diameter800mm1000mm1200mm
Inlet Pipe :mmDN100DN125DN150
Output Pipe:mmDN125DN200DN250
Gas Discharge pipeDN125DN200DN200
Weight:KG180022002500
Dimensions1800x1800x53502000x2000x58602200x2200x6634

Detailed Pic
 




 
Why choose us ? 

Q1. Are you a manufacturer?

Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided . 

Q2. Do your equipment come with a warranty?

Yes, we have one year warranty. and we provide very patient after service job .

Q3. Can we customize the equipment from you?

Yes,  actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.

Q4. How do you deliver your equipment?

By sea usually 

Q5. What's the lead time for the equipment and its spare parts?  

Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.




If you interested , Welcome to inquire us . Looking Forward with your cooperation  .





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA