Adjustable prop
steel prop are widely used in different supporting areas. Slab formwork and table formwork with its high loading capacity may meet maximum
stability for your site jobs. Slab thickness up to 300mm.
1.Diameter of inner tube: 40mm,48mm,etc.
2.Diameter of outer tube: 48m,56mm,60mm etc.
3.Wall thickness:1.6mm,1.7mm,1.8mm,2mm etc.
4.Adjustable length:heavy duty 1800-3200mm,2100-3400mm,2200-3900mm ,
2200-4000mm,3000-5000mm,3500-4000mm etc.
light duty 1600-3000mm,1800-3500mm,2000-3500mm etc.
5.Base plate:120*120*4mm/4.5mm/5mm,150*150*6mm
6.Shape of base plate:flower or square
7.Surface : paint,hot dipped galvanized,pre-galvanized,electrical galvanized
8.Type:with hands cup or open thread
9.OEM service is available
10.Package:in bundle or in bulk
Heavy duty prop
MIN | MAX | Inner tube | Outer tube |
1.8m | 3.2m | 48*2.0mm | 60*2.0mm |
2.1m | 3.4m | 48*2.0mm | 60*2.0mm |
2.2m | 4.0m | 48*2.0mm | 60*2.0mm |
2.4m | 3.9m | 48*2.0mm | 60*2.0mm |
3.5m | 4.0m | 48*2.0mm | 60*2.0mm |
3.0m | 5.0m | 48*2.0mm | 60*2.0mm |
Light duty prop
MIN | MAX | Inner tube | Outer tube |
1.6m | 3.0m | 40*2.0mm | 48*2.0mm |
48*2.0mm | 56*2.0mm | ||
1.8m | 3.5m | 40*2.0mm | 48*2.0mm |
48*2.0mm | 56*2.0mm | ||
2.0m | 3.5m | 40*2.0mm | 48*2.0mm |
48*2.0mm | 56*2.0mm |

Steel pipes (both external and internal) are then cut to size with a +/-1 mm tolerance. Cutting is done using automatic cutting machines: a bundle of pipes is placed on the loader which selects one pipe at a time. It is then loaded on a positioning device and cut precisely at the desired height. Lastly, the pipe is unloaded into a container for the subsequent step.
Step 2, DRILLING
Then there follows the drilling step, which is carried out depending on the type of pipe. Due to the new technologies, the drilling is quick, precise and burr-free
Step 3, WELDING
External pipes proceed to the welding step, where - suitably positioned - they are assembled with the base plate and the end is threaded . Once drilled, the internal pipes undergo the same welding process but concerning the plate only.
Step 4, COATING AND GALVANISING
Once welded, the props can be: dip coated, cold-dip galvanised (electrolytically), for a more durable protection with respect to dip coating and for better aesthetic quality, or hot dip galvanised for a basically permanent protection, suitable for all environments and withstanding external atmospheric agents.
Step 5, FINISH
Depending on the product, next come the completion steps including: mounting an outer sleeve on the covered threading or a forged steel ring nut.
Step 6, CUSTOMISATION
Customised products are available upon request: for example with a ring nut bearing the customer's colours, or the customisation of the prop using stickers bearing the customer's logo.
Step 7, PACKAGING AND SHIPMENT
Once concluded with machining, we proceed to the packaging step. Packages usually come with 40 pieces, strapped. The material is then loaded into a truck or container and shipped.


♦Welding is full, without lack and fake welding.
♦Strong Packing and easy for handle.
♦Prop Type: Base Plate/ U-head Plate
♦Plate Shape: Flower / Square
♦Tolerence Control is strict.

DESCRIPTION: Steel prop, Scaffolding Steel Prop
Scaffolding steel props are mainly used for supporting slab formwork.Numerous practical features ensure fast and safe handling.Scaffolding Steel Planks are frequently used in scaffolding acess platform and construction area, which is convenient for workers to walk through on it by providing strong support during usage. It is a fitting part of scaffolding, commonly be used together with scaffold tube, steel frame and ringlock systems. There are different types for etal steel planks, with hooks or without hooks.

QUALITY CONTROL
We have a strict quality system, the raw materials of each order will be tested before production, and a rolling mill test certificate will be provided to customers.
1)Before Shipping ,Our professional Inspectors Will Check The Pipe's Diameter ,Thickness ,Length, Chemical Composition, Mechanical Properties,Zinc Coating etc, Everything is Ok, Then Will Shipping and Supply a MTC With Full Information .
2) Support The Third Party Inspection ,SGS, BV and Others.

The product is mainly used in industries such as construction, light industry, automobiles, agriculture, animal husbandry, fishery, and commerce.
The construction industry is mainly used for manufacturing anti-corrosion industrial and civil building roof panels, roof grilles, etc.
Light industry uses it to manufacture home appliance shells, civilian chimneys, kitchen utensils, etc.
The automotive industry is mainly used for manufacturing corrosion-resistant components of automobiles.
Agriculture and animal husbandry are mainly used for food storage and transportation, as well as tools for freezing and processing meat and aquatic products.
FAQ
Q1: Are you a trading company or a factory?
A: We are a manufacturer specialized in Machining OEM parts.
Q2: Do you accept to manufacturing customized products based on our design?
A: Yes, we are a professional factory with an experienced engineering team, would like to provide the OEM service.
Q3: How can I get the quotation?
A: We will offer you the quotation within 24 working hours after receiving your detailed information. In order to quote you faster and more accurate, please provide us the following information together with your inquiry:
1) CAD or 3D Drawings
2) Tolerance.
3) Material requirement
4) Surface treatment
5) Quantity (per order/per month/annual)
6) Any special demands or requirements, such as packing, labels, delivery,etc.
Q4: Will my drawings be safe after sending them to you?
A: Sure, we will keep them well and not release to others without your permission.
Q5: How long is the lead-time for sample and Bulk production?
A: Normally, the lead time for samples is around 2-4 weeks, for bulk production is around 4-8 weeks (depends on order quantity)
Q6: I have no 3D drawing, how should I start the new project?
A: You can supply us the sample or provide us the product sizes and let us know the detailed requirements, our engineers will help you to work out the 3D drawing.
Q7: Is it possible to know how are my products going on without visiting your factory?
A: We will offer a detailed production schedule and send weekly reports with digital pictures and videos which show the machining progress.