Product Description
1.Flexible layout
2.Good ductility,strong plasticity and deformability, hign seismic resistant and wind resistant
3.Quick build and long service time.
4.Light weight,high quality but low cost
5.Environmental, material can be 100% recycled and degraded.

Poject Details
Name of Project: Prefab Light Steel Structure Logistics Warehouse
Building System: Light Steel Structure
Project Site: Uzbekistan
1.Primary Steel Frame: | Welded H section Steel with anti-rusting painting; |
2. Secondary Steel Framework | (included purlin, tie bar, bracing bar, angle steel, roof & wall support): C purlin, round steel, steel bar and angle steel |
3.Roof Materials: | Fiberglass Wool Sandwich Panel, Thickness=50mm |
4. Wall Materials: | Fiberglass Wool Sandwich Panel, Thickness=50mm |
5. Window: | PVC Window |
6. Door: | Sliding Door |
Application


Light steel structure building is a new type of building structure system,which is formed by the main steel framework linking up H section,Z section,C section or U section steel components,roof and walls using a variety of panels and other components such windows,doors,cranes,etc.Light steel structure building is widely used as warehouses,workshops,large factories...etc.
Because of the diversification of steel structure material and the flexible design, the light steel structure projects can better meet customers' demands for space structures, and reasonable economy.
Material Can Be Choosed

Our Service
1)Rich experience and professional team
With more than 10 years' experience, our employees have been professionally trained and evaluated , we can manufacture strictly according to your drawings and request or design by ourselves to provide you a most satisfactory solution to you.
2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.
3)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified 5)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
We offer One stop service from design, manufacture, deliver to installation and after-service.

Company Profiles
Established in 1997, Qingdao Taiwei Steel Structure Co.,Ltd is a professional designer, manufacturer and seller of light steel structure material and its constructions, such as steel structure warehouse/ workshop, prefabricated house, livestock and poultry house, as well as light steel office and green house etc.We are one of the few companies that has advanced processing equipment and good production capacity. And we have finished a great deal of important projects: Mega Mill,Pure Floor Mill and so on. The products have been exported to more than 90 countries and regions.
And we can offer" One stop service from design, manufacture, deliver to installation and after-service".

Installation
we will provide you detailed construction drawing, we also can send technicians and workers to your country for installation.

Projects show




I can give you a quoted price if you offer this:
1. Dimension: Length, width, height etc.
2. Doors and windows: Dimension, quantity, position.
3. The material on the roof and the wall.
4. Local climate: Wind speed, snow load, seismic magnitude etc.
5. If you have other requirements, please also inform us.
6. It's better if you have your own drawings .Please send them to me.
FAQ
1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balancebefore loading by TT.
3.What is the delivery time?
It depends on order quantities and how complicated it is.Generally speaking,the delivery time will be within 30 to 50days after deposit.
4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.