WT-ND-559
on Site Installation Guiding
Bolt Connection
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity
Support Installation
H Section Steel Column & Beam
Bracing, Tie Bar, Angle Brace, Ect.
C/Z Type Galvanized Steel Purlin
Sandwich Panel, Steel Sheet
50mm, 75mm, 100mm, 150mm
0.4mm~0.7mm
Sliding Door/Ruller Sutter Door
PVC/Aluminium Window
Shot Blasting, Galvanized or Painted
Auto CAD, Pkpm, Tekla
45-60 Days
GB, ASTM, AISI
Carbon Structural Steel
High-Strength Steel
Q235
WT
Steel Palet/Container Transport
L*W*H
China
94069000
Product Description
Discover the marvel of modern engineering with our Prefabricated Steel Structure Building/Workshop/Warehouse/Construction Building From China, meticulously crafted with professional design for those who seek excellence.






Production Description
Project Showcase




Our Manufacturing Facility

Gaomi Wantai Steel Structure Engineering Co., Ltd stands as a beacon of expertise, specializing in the art of designing and manufacturing a wide array of steel structure buildings, workshops, bridges, and diverse structural projects for over 12 years. Spanning a vast area of 260,000 square meters, our facility proudly exports an impressive 50,000 tons of steel structures annually. Accredited with ISO9001:2015, ISO14001:2015, SGS, and BV Certification, we blend rich experience with a cadre of professional engineers, cutting-edge technology, and unparalleled after-sales service. This stellar mix of top-tier talents and state-of-the-art equipment positions Wantai as an industry-leading enterprise, winning accolades both domestically and internationally.





Certifications

Our Comprehensive Services
Delivery Timeline:Typically, our delivery is swift and efficient, occurring within 45-60 days after confirmation of the order, which is contingent upon the fabrication quantity.
Installation Process:
Int'l Trade Team:
Our dedicated team of six international trade businessmen is available online 24/7, ready to assist you at any time.
Maintenance Guidelines:
To ensure longevity and the preservation of the structure's aesthetic appeal, it is imperative to apply the finish paint immediately after frame installation, with a subsequent application after 6-8 months.
This proactive approach ensures the surface remains pristine for an extended period.
Global Projects:











Production Description
No. | Item Name | Description | |
1 | Main Steel Member | Main Steel Frame | Q345B Welding H Beam |
2 | Stairs | Channel Steel | |
3 | Purlin | Purlin | Galvanized C-Steel |
4 | Secondary Steel Member | YC-Verge Angle | Angle Steel |
5 | XG-tie | Round Tube | |
6 | Roof&Window Bracing | Round Steel | |
7 | Floor Deck | ||
8 | Panel | Sea-blue Roof Panel | Rock Wool Colour Steel Composite Plate |
9 | White-gray Wall Panel | ||
10 | Maintenance Materials | Roof Panel Edges Trim, Outer Ridge Tile, Outside Corner 90º, Dado Flashing, Door Trim, Windows Trim, Outside Gutter, Downspout, Floor Deck Trim | |
11 | Door | Composite Plate Door | |
12 | Widows | Aluminum Alloy Window | |
13 | Install Accessories |
Project Showcase




Our Manufacturing Facility

Gaomi Wantai Steel Structure Engineering Co., Ltd stands as a beacon of expertise, specializing in the art of designing and manufacturing a wide array of steel structure buildings, workshops, bridges, and diverse structural projects for over 12 years. Spanning a vast area of 260,000 square meters, our facility proudly exports an impressive 50,000 tons of steel structures annually. Accredited with ISO9001:2015, ISO14001:2015, SGS, and BV Certification, we blend rich experience with a cadre of professional engineers, cutting-edge technology, and unparalleled after-sales service. This stellar mix of top-tier talents and state-of-the-art equipment positions Wantai as an industry-leading enterprise, winning accolades both domestically and internationally.





Certifications

Our Comprehensive Services
Delivery Timeline:Typically, our delivery is swift and efficient, occurring within 45-60 days after confirmation of the order, which is contingent upon the fabrication quantity.
Installation Process:
- Upon completion of production, we provide detailed steel building installation drawings, ensuring clarity and precision.
- Should you require, we offer the additional service of dispatching technicians to the site to guide and oversee the installation process.
Int'l Trade Team:
Our dedicated team of six international trade businessmen is available online 24/7, ready to assist you at any time.
Maintenance Guidelines:
To ensure longevity and the preservation of the structure's aesthetic appeal, it is imperative to apply the finish paint immediately after frame installation, with a subsequent application after 6-8 months.
This proactive approach ensures the surface remains pristine for an extended period.
Global Projects:





