Prefabricated Wall Panels for Concrete Formwork Construction

Price $90.00 Compare
Min Order 300 Square Meters
Shipping From Hebei, China
Popularity 254 people viewed
Quantity
+-
 

HORIZON FORMWORK CO., LTD.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
Timber Beam & Steel Walings
High Formwork
Wall Form, Column Form, Vertical Shuttering
Wood
Customized
Concrete Wall
HORIZON
Pallet
SGS
China
7308400
Product Description
Prefabricated Wall Panels for Concrete Formwork Construction 

High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens. 

Advantages: 
1. Can create any shape and size of wall formwork with any thickness. 
2. Can choose whichever form face material best meets your requirements - e. G. For smooth fair-faced concrete. 
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials. 
4. Can be pre-assembled on your site or before arrival at your site, saving time, cost and space for you. 
5. Can match well with most Euro formwork systems. 

Wall Formwork Components: 
ComponentsDiagram / photoSpecification / description
Wall formwork panel
For all vertical formworks
H20 Timber beam

Water proof treated
Height: 200mm
Width: 80mm
Length: As per table size

Steel waling

Painted, powder coated
[12 steel channel

Flange clamp

Galvanized
To connect steel waling and H20 beams

Panel strut

Painted

Waling connector 80

Painted
Used for formwork panels alignment

Corner connector 60X60

Painted
Used for forming inner corner formwork with wedge pins

Top scaffold bracket

Painted, 
Severs as safety working platform





Packing: 

1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---bundles: Timber beam, steel props, tie rod, etc. 
---pallet: Small parts will be put in bags and then on pallets. 
---wooden cases: It is available on customer's request. 
---bulk: Some irregular goods will be loaded in bulk in container. 

Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA