L85
24 Hours
1 Year
CE, ISO9001, ISO9001: 2000
New
150-200m
8t
Jack-Up
Fixed
Top-Slewing Crane
Luffing Tower Crane L80
6t
40m
1.5t
1.6*1.6*3.0m
Hydraulic
Wire Rope
Construction Usage
Mingwei
Container
ISO
China
8426200
Product Description
Professional Luffing Tower Crane L85
The luffing cranes are equipped with multiple security systems which provide maximum drving comfort and the safest possible operation The various types of hoisting winches offered for luffing cranes make it possible to handle light or heavy loads whilst still providing precision, progressive movements and rapidity.
The hoisting winch provides perfect control over the luffing and lowering moments on the jib.
The high performance of the slewing mechanisms will meet your requirements for control over accelerations and precision over low speeds in all the slewing movements of the jib.

LUFFING TOWER CRANE L160
1. Max. Load: 6t
2. Jib length: 40m
3. Tip load: 1.5t
4. Free standing height: 35.339m
5. Mast section: 1.6*1.6*3.0m
6. Type: Stationary, inner-climbing, travelling tower crane
Load diagrams
The luffing cranes are equipped with multiple security systems which provide maximum drving comfort and the safest possible operation The various types of hoisting winches offered for luffing cranes make it possible to handle light or heavy loads whilst still providing precision, progressive movements and rapidity.
The hoisting winch provides perfect control over the luffing and lowering moments on the jib.
The high performance of the slewing mechanisms will meet your requirements for control over accelerations and precision over low speeds in all the slewing movements of the jib.


LUFFING TOWER CRANE L160
1. Max. Load: 6t
2. Jib length: 40m
3. Tip load: 1.5t
4. Free standing height: 35.339m
5. Mast section: 1.6*1.6*3.0m
6. Type: Stationary, inner-climbing, travelling tower crane
2 falls | 4 falls | Drum | Ch-PS hp | kw | ||||||||||||||
Hoisting | 33PC15 | m/min | 80 | 40 | 40 | 20 | 400m | 33 | 24 | |||||||||
t | 0-1.5 | 1.5-3 | 0-3 | 3-6 | ||||||||||||||
Luffing | 40DRW40 | min | < 3.0 | 40 | 30 | |||||||||||||
50LVF25 | min | < 3.0 | 50 | 37 | ||||||||||||||
Slewing | RCV145 | r/min rpm | 0-0.7 | 6 | 4.4 | |||||||||||||
Traveling | RT443 | m/min | 12.5/25 | 2× 7 | 2× 5.2 | |||||||||||||
Main supply | CEI38 IEC38 | 400V(+6%-10%) 50Hz | ||||||||||||||||
Necessary electric power | 33PC: 80 kVA |
Load diagrams
Jib Length | |||||||||||||||||
40m | m | 4.8-18 | 20 | 22 | 25 | 27 | 28.5 | 30 | 32 | 35 | 37 | 40 | |||||
t | 6.0 | 5.2 | 4.6 | 3.7 | 3.3 | 3.0 | 2.7 | 2.4 | 2.0 | 1.8 | 1.5 | ||||||
35m | m | 4.8-18 | 20 | 22 | 25 | 27 | 28.5 | 30 | 32 | 35 | |||||||
t | 6.0 | 5.2 | 4.6 | 3.7 | 3.3 | 3.0 | 2.7 | 2.4 | 2.0 | ||||||||
30m | m | 4.8-18 | 20 | 22 | 25 | 27 | 28.5 | 30 | |||||||||
6.0 | 5.2 | 4.6 | 3.7 | 3.3 | 3.0 | 2.7 |