Pure Copper Coil 15HP 7000 Watts 7kw 7.5kw 7.5 kVA Gasoline Generator (Electric start with battery)

Price $398.00 Compare
Min Order 50 Sets
Shipping From Zhejiang, China
Popularity 200 people viewed
Quantity
+-
 

Taizhou Longfa Machinery Co., Ltd.

VIP   Audited Supplier 17 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • David WhatsApp/Wecha (Mr.)  
    six three double eight nine tw
LF9000E
with
12 / 18 / 24 Months Optional
AC Single Phase
Electric Start
Single-Phase
5-10kW
Standard
100% Copper Wire Winded
with or Without Is Optional
Optional
Optional
ANDI, ELEFUJI, OEM, LONFA
Export Strong Carton Package
140PCS 1X20ft, 280PCS 1X40HQ
Taizhou, Zhejiang Province in China
8502200000
Product Description



 

GeneratorRating frequency(Hz)50/60
Rating Voltage(V)110/120/220/230/240
Rating power(KVA)6.5/7.0
The Max.power(KVA)7.0/7.5
Power factor(cos)1/.00.8
EngineType190F/15HP
CategorySingle crock,Force air-cooled four-stroke,top-intalled gasoline engine
Exclusion of cylinder(cm3)420
The Max.output power(KW/rpm)10.0/3600
Ignition systemTransistorized magneto
Start systemRecoil/E-start
Capacity of fuel tank(L)25
Consumption of fuel(L/h)2.95
Consecutive Working(h)8
Noise(at7m)(dB)68
Capacity of engine oil1.1
DimensionSet                       dimension(mm3)692×522×545
Net weight(kg)85
Standard EquipmentLarge capacity fuel tank,large capacity muffler,fuel gauge,voltmeter,AVR,oil alert,Ac circuit breaker
PurchasingFour-wheel dolly kitYes






1. Are you manufacture or trade company ?
We are manufacture specialized in Generators / Engines / Light Construction / Garden / Agriculture machinery since 2003.
Our factory have passed ISO9001 Audit ,we are AAA grade credit enterprise.


2. About MOQ:
Normally our MOQ are with 10 / 20 / 50 single model for trial order.
For some products we have in stock, the MOQ will be less than above.


3. About OEM:
Welcome, you can send your favourite design products photos and LOGO, we can open new mold and print or emboss any
LOGO for you based on relative order quantity .


4.About Quality Control :
A, all the raw materials & spare parts by IQC(Incoming Quality Control )before launch whole process into the process
after the screening.
B,process each link in the process of IPQC (Input process quality control ) patrol inspection.
C,after finished by QC full inspection before packing into the next process packaging .
D,OQC before shipment for each machine set to do full inspection .


5. About warranty:
All of our products are with 12 / 18 / 24 Months Warranty Quality Grade based on different requirements configuration .




 

 

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA