9002-86-2
(CH2-Chcl)N
208-750-2
White
PVC Resin
S1000, S700, S1300, Sg3, Sg5, Sg7, Sg8
Pipe, Shoes, Cable Wires and So on
ISO
1mt
Vrigin
Powder
25kg/Bag
SINO PEC S1000
China
3904109090
Product Description

PVC resin S-1000 is widely suitable for producing soft films, sheets, artificial leather, pipes, profiles, cable protection tubes, packaging films, hoses, shoe soles and various soft miscellaneous goods.


PROPERTIES | DG-1000K | |
Superior Product | Qualified Product | |
Polymerization Degree, P | 981~ 1080 | |
K-value | 66-68 | |
Impurity Particle Number, ≤ | 16 | 60 |
Volatile Matter, % ≤ | 0.30 | 0.40 |
Apparent Density , g/mL | 0.51~0.57 | |
Residue on 0.25mm sieve , ≤ | 1.6 | |
Fish eye Number, /400cm2 ≤ | 20 | 60 |
Plasticizer Absorption, g/ 100g | 20 | - |
Whiteness ( 160ºC, 10min), % ≥ | 78 | 70 |
Residual VCM Content, μg/g | 1 | 10 |
Trunk Time, s/400cm³ | 2.0~6.0 |


Specifications:
Specification Index | Grade |
DG-1000S | |
Outward Appearance | White powder |
Mean Degree of Polymerization | 1021 |
Number of Impurities,NO./100g | 16 |
Volatiles Content,% | 0.13 |
Apparent Density,g/ml | 0.53 |
Screening(0.25mm),% | 1.1 |
Fisheye Number,NO./400cm² | 20 |
Plasticiser Absorption,g/100g | 24 |
Whiteness(160ºC,10 minutes),% | 78 |
Residual VCM,ug/g | 0.1 |
The trunk stream of time,s/400cm³ | 3 |
DG-700 is a low-poly PVC raw material, which can generally be used for the processing of injection molding products, such as pipes for cold water pipes and pipe fittings. Solid accessories for everyday items (such as plastic housings or handles in most household appliances).
DG-800 is a low-poly PVC raw material, in addition to the above applications, can also be used in plastic accessories that do not require very high elastic properties. Such as stationery, machine parts and so on.
DG-1300 is a high poly PVC raw material, which is used in the processing of auxiliary parts with high ductility and elasticity requirements. Such as containers, sporting goods, etc.
Some of the PVC brands available are as follows:


Artificial Leather Cable Protection Pipe











All the products must be tested strictly according to the testing procedure before shipment.
2. About Delivery Period
Normally delivered in 7 working days after the confirmation of order& payment. And it varies according to the material and quantity.
3. About Payment Term
It's flexible, T/T, L/C at sight.
4. About the mode of transportation
(1) by sea
(2) by train
5. If I order in large quantities, can the price be lower?
A: Yes, we can offer a discount for large orders.