MK-0048
Machinery Parts
CNC Machining
Aluminum Alloy
Spray Coating
3D
as Drawings
Material Inspection Report
Dimension Report
ANSI
CE, ISO 9001:2000
Oxidation
Laser Cutting
Polishing, Machining, Chrome Plated
ISO9001:2008
Fob, CFR or CIF
Plastic Bag + Carton +Pallet
Within 30 Days
OEM
Carton/Pallet
ISO 9001: 2000
Qingdao, China
7616999000
Product Description



Detail

High precision and complex shape: Our permanent casting aluminum technique excels in delivering components with exceptional dimensional accuracy and intricate designs, significantly minimizing the necessity for follow-up processing. The adaptable mold design is ideal for creating parts with intricate and detailed features.
Excellent surface quality: Enjoy the benefits of a flawless casting surface, drastically reducing the need for additional polishing or treatment. With the ability to go straight to electroplating, spraying, or other surface enhancements, the process elevates product aesthetics while bolstering corrosion resistance.


High production efficiency: Designed for high-volume production, our permanent casting process accelerates single molding speeds, achieving remarkable production efficiency. With extended die longevity, it's the optimal choice for long-term, large-scale manufacturing ventures.
Product Material | Aluminum alloy |
Design software | CAD,solidworks |
Application | Machinery Parts |
Surface treatment | Polishing, Grinding, Anodization,powder coating |
Mould life | 25000-30000shots |
Standard | GB |
Machine | CNC EDM |
Delivery Time | 25-30 Days |













Q1.Is it possible to customize production?
Yes, customized production according to customer requirements is our advantage
Q2.MOQ
According to the customer's needs,
Q3.How to obtain a quotation?
Please provide 2D or 3D drawings and inform us of the material, surface treatment, procurement quantity, etc. We will provide the most cost-effective quotation according to the customer's requirements
Q4.Product production cycle
After determining the product details, the mold will be ready in 25-35 days. Produce samples within 2-3 days.