Roof Waterproofing and Leak Repair Materials Liquid Rubber Coating Building Material

Price $2.50 Compare
Min Order 25 kg
Shipping From Guangdong, China
Popularity 363 people viewed
Quantity
+-
 
ISO
Outdoor Paint
Brush, Roller
Grey
Single Component
25kg
Waterproof
RISING
Plastic Bucket
Multiple specifications
Guangzhou, China
Product Description
We can provide you with a small amount of samples for free, but you will need to pay for the shipping cost.

Specializing in the production of various types of building waterproof coatings and undertaking OEM orders


Exposed Treasure Outdoor Waterproof Coating

Product Introduction:
This product is a new generation of roof exposed waterproof coating, which is based on a variety of lotion and promoted by imported additives.

Application scope:
This product can be widely used in projects such as concrete roofs, metal roofs, glazed tile roofs, and building exterior walls.

Product features:
1. Can withstand high and low temperatures;
2. After film formation, it has high strength, good tensile cracking resistance, and is not easily worn when walking;
3. Strong weather resistance and long-lasting waterproofing;
4. Good water resistance, suitable for roofs with long-term water accumulation;
5. Single component water-based products have good environmental friendliness and excellent construction performance.

Construction technology:
1. Construction preparation: Clean the base surface, repair holes, depressions, hollows, and cracks on the base surface, remove oil stains, debris, and floating dust on the base surface, and keep the base surface clean and tidy;
2. Grassroots treatment: If the base surface is prone to powdering, it is recommended to first use Yingzhi Gudebao for base reinforcement treatment. The base surface should be kept dry and free of visible and accumulated water, and finally large-scale construction should be carried out;
3. Waterproof construction: Apply a large area of brush or roll coating 2-3 times. Once the first coat is not sticky to the touch, the next coat can be applied.
Dosage reference: 1.5-2KG (applied 2-3 times), the smoother the base surface, the larger the coating area.

matters needing attention:
1. Pay attention to weather changes before construction. In order to achieve better film-forming effect of the material, it is recommended to maintain a film-forming time of at least 24 hours after painting.
2. Store in a cool place. This product is water-based and should be protected from freezing and sun exposure.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA