Sbs Modified Bitumen Waterproof Membrane for Roof Repairing

Price $4.20 Compare
Min Order 3000 Square Meters
Shipping From Beijing, China
Popularity 380 people viewed
Quantity
+-
 

Beijing Oriental Yuhong Waterproof Technology Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
PMB-741
ISO, CE
3.0mm
15 Days After Payments Received
Roofing and Waterproofing
Roll
Film Coated
Waterproof
Black
Outdoor, Indoor
Bitumen
Py
Oriental Yuhong
Woven Bags
10m2/roll
China
Product Description

PRODUCT DESCRIPTION
 
PMB-741 is a kind of modified bituminous waterproof sheet, which is consisted of styrene-butadiene-styrene (SBS) as modifier, polyester tire base fabric as reinforced layer. Besides polyethylene (PE) film, fine sand (S) or mineral aggregates (M) as the isolating material is stickup on the surface of the sheet.




 
APPLICATION AREA
 
1. Industry and civil construction projects.
2. Tunnels. Subways. Bridge surface
3. Indoor swimming pool, fire pool
3. Other underground projects





 

FEATURES
 
1. High strength waterproof layer and strong water pressure resistance.
2. Good performance of breaking resistance,tearing resistance,corrosion resistance.

3. High tensile stength, high elongation.
4. Good temperature resistance: can work under -20ºC.
5. Good workability: Torch-applied.



 

STORAGE
 
1. Various kinds of sheets should be transported or stored respectively and marked clearly.  
2. No exposed to the weather, keep ventilated. Temperature of storage should be below 50ºC.
3. More than two-layer sheets are not allowed for stacking vertically during the process of transportation,
4. Avoid the sheet to be banked or pressed laterally during the transportation process.
5. Under normal circumstances, the quality guarantee period is 1 year.

APPLICATION METHOD
 
Base treatment → Construction of additional layer →Sheets paste construction by hot bonding → Exhausting and compaction → Water permeability experiment → Construction of the protection layer




 

NOTICES

 
1. Please stop construction when the weather is above or equal to 5 winds or rainy and snowy day.
2. Temperature of construction is best above 0ºC.
3. If it is rainy during the construction process, some protective measures should be taken for the sheets which have been pasted well.
4. The distance between the nozzle of flame heating apparatus and the sheet should be appropriate. The sheet should be heated evenly, when the color of melted surface of the sheet is black-lighted, it is just right.

 
CLASSICAL PROJECTS
 

CONTACTS



 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA