RCDEB
Magnetic Separator
380V
5T
Stainless Steel
Dust-Prrof
ISO9001:2008, ISO9001:2000, CE
Energy Saving
1 Year
Customized
Customized
New
Customized
0.5~200tph
Engineers Available Overseas
Manual Cleaning
Max 4.5 M/S
Oil-Cooling
BAITE
Polywood and Steel Frame
stainless steel
China
84741000
Product Description
Introduction:
For the port of coal transportation, big thermal power plant, mine and building material. It can also work in the harsh environment such as dust, humidity, salt fog.
Features:
-- High-quality cooling oil and optimized oil circulating design.
-- No noise, quick heat releasing, low temperature rising.
-- Compact structure, easy maintenance, reliable and longtime trouble-free operation.
-- The coils have unique features like anti-oxidation, anti-rust and good insulation.
Technology Characteristics:
-- Absorbing the advanced oil forced circulation technology for the large or medium transformer both home and abroad, it features with low temperature (≤40°C) rising and the technology is reliable and safety.
-- Magnetic route is short, magnetic waste is less, the gradient is high and removing iron efficiently.
-- Light weight reasonable oil line, compact cooling structure and high heat-releasing efficiently.
-- The exciting coil is completely dipped into the transformer oil to be dust-proof, moisture-proof and anti-corrosion.
-- Made three-dimensional excitation coil winding, the area for heat releasing is large to control the temperature (≤40°C) for long service life.
Overl Dimension Drawing:
Technical Parameters
FAQ
A: Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.
Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement.
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3 Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.
5.Package & Ship:
Work Shop View:
For the port of coal transportation, big thermal power plant, mine and building material. It can also work in the harsh environment such as dust, humidity, salt fog.
Features:
-- High-quality cooling oil and optimized oil circulating design.
-- No noise, quick heat releasing, low temperature rising.
-- Compact structure, easy maintenance, reliable and longtime trouble-free operation.
-- The coils have unique features like anti-oxidation, anti-rust and good insulation.
Technology Characteristics:
-- Absorbing the advanced oil forced circulation technology for the large or medium transformer both home and abroad, it features with low temperature (≤40°C) rising and the technology is reliable and safety.
-- Magnetic route is short, magnetic waste is less, the gradient is high and removing iron efficiently.
-- Light weight reasonable oil line, compact cooling structure and high heat-releasing efficiently.
-- The exciting coil is completely dipped into the transformer oil to be dust-proof, moisture-proof and anti-corrosion.
-- Made three-dimensional excitation coil winding, the area for heat releasing is large to control the temperature (≤40°C) for long service life.
Overl Dimension Drawing:
Technical Parameters
NO. | Model | conveyor belt width (mm) | Suspension height (h=mm) | Magnetic intensity (≥mt) | Belt speed (m/s) | Existing power (≤kw) | Condenser power (≤kw) | Weight (kg) | Appearance size (mm) | |
1 | RCDEB-10 | T1 | 1000 | 300 | 90 | ≤5.8 | 6.5 | 0.25 | 2600 | 1700×1210 |
T2 | 120 | 9.5 | 0.25 | 2950 | 1700×1250 | |||||
T3 | 150 | 15.0 | 0.25 | 3470 | 1750×1280 | |||||
2 | RCDEB-12 | T1 | 1200 | 350 | 90 | 9.0 | 0.25 | 2900 | 1750×1280 | |
T2 | 120 | 14.0 | 0.25 | 3500 | 1750×1280 | |||||
T3 | 150 | 20.0 | 0.25 | 5400 | 2000×1380 | |||||
3 | RCDEB-14 | T1 | 1400 | 400 | 90 | 14.0 | 0.25 | 3000 | 1750×1280 | |
T2 | 120 | 20.0 | 0.25 | 5500 | 2000×1420 | |||||
T3 | 150 | 29.0 | 0.25 | 7460 | 2230×1450 | |||||
4 | RCDEB-16 | T1 | 1600 | 450 | 90 | 18.0 | 0.25 | 5400 | 2000×1420 | |
T2 | 120 | 28.0 | 0.25 | 7500 | 2230×1450 | |||||
T3 | 150 | 32.0 | 0.25 | 8550 | 2350×1480 | |||||
T4 | 175 | 52.0 | 0.75 | 10200 | 2570×1550 | |||||
T5 | 200 | 70.0 | 0.75 | 11875 | 2570×1600 | |||||
T6 | 225 | 85.0 | 1.1 | 14250 | 2570×1650 | |||||
T7 | 250 | 104.0 | 0.55×2 | 15500 | 2570×1720 | |||||
5 | RCDEB-18 | T1 | 1800 | 500 | 90 | 26.0 | 0.75 | 7600 | 2250×1480 | |
T2 | 120 | 32.0 | 0.75 | 8600 | 2350×1480 | |||||
T3 | 150 | 40.0 | 0.75 | 10500 | 2460×1500 | |||||
T4 | 175 | 56.0 | 0.75 | 14600 | 2600×1600 | |||||
T5 | 200 | 75.0 | 0.75 | 17600 | 2650×1650 | |||||
T6 | 225 | 90.0 | 1.1 | 18500 | 2700×1700 | |||||
T7 | 250 | 107.0 | 0.55×2 | 19200 | 2750×1720 | |||||
6 | RCDEB-20 | T1 | 2000 | 550 | 90 | 30.0 | 0.75 | 8800 | 2400×1480 | |
T2 | 120 | 39.0 | 0.75 | 10600 | 2500×1500 | |||||
T3 | 150 | 41.0 | 0.75 | 12500 | 2660×1500 | |||||
T4 | 175 | 70.0 | 0.55×2 | 21600 | 2750×1620 | |||||
T5 | 200 | 83.0 | 0.55×2 | 22500 | 2820×1650 | |||||
T6 | 225 | 104.0 | 0.55×2 | 23900 | 2870×1680 | |||||
T7 | 250 | 125.0 | 0.55×2 | 25600 | 2900×1750 |
FAQ
Q: Are you a factory ?
A:Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q: Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 45 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.
Q:Guarantee period:
A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?
A: Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.
Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement.
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3 Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.
5.Package & Ship:
Work Shop View: