on Line
One Year
700mm
Motor Parameter Testing
<1000KN
0.5
Electronic Load
Dynamic Load
Digital
Computer Control
0-100Kg
AC220V
100W~200kw Power Level
0~690V
0~12000rpm
Positive0.01% of Reading +Positive 0.03% of Range
Positive and Negative0.03%
Positive and Negative1rpm
Positive and Negative0.05%F.S.
Changniu Technology
Dust-Free Packaging + Sturdy Wooden Crates
Hangzhou, China
Product Description
Servo Motor Power Dynamometer No-Load Test Bench Factory Customised |
Servo motor test system (electric dynamometer)
Servo motors are more and more widely used in all walks of life, and servo motors must ensure product performance and product quality in product development and factory testing, so it is particularly important to conduct strict testing and analysis of the performance of the motor. According to the performance test part of the national standard GB/T 30549-2014 "General Technical Conditions for Permanent Magnet AC Servo Motors" and with reference to other national standard requirements and various servo motor test standards, the servo motor test purpose, test steps and test methods are tested for type verification.
The servo motor test system adopts a modular, integrated design, and the operation part is ergonomically designed, and can complete manual/automatic mode control. It is composed of three parts: mechanical system, electrical system and host computer software system.
Servo motors are more and more widely used in all walks of life, and servo motors must ensure product performance and product quality in product development and factory testing, so it is particularly important to conduct strict testing and analysis of the performance of the motor. According to the performance test part of the national standard GB/T 30549-2014 "General Technical Conditions for Permanent Magnet AC Servo Motors" and with reference to other national standard requirements and various servo motor test standards, the servo motor test purpose, test steps and test methods are tested for type verification.
The servo motor test system adopts a modular, integrated design, and the operation part is ergonomically designed, and can complete manual/automatic mode control. It is composed of three parts: mechanical system, electrical system and host computer software system.

1.Mechanical system: cast iron platform, loading system, quick clamping system, shafting connection part and other equipment.
2.Electrical system: driving power supply (voltage regulator, controller, etc.) loading control, sensor (torque, speed, current, voltage, vibration, temperature) real-time data acquisition equipment, data acquisition, current sensor acquisition, electrical parameter measurement equipment, alarm system and other equipment.
3.Software system: The upper computer test software is divided into data acquisition communication module, data acquisition setting module, data real-time exchange control module, and data processing module. The host computer completes the functions of test control, data analysis and display, data recording and export according to the test items.Trial Items: Insulation resistance test, no-load test, locked-rotor test, temperature rise test, load test (efficiency, power factor, and slip rate measurement), maximum torque test, short-time overload torque measurement, overspeed test, etc.
Main applications:
Industrial AC servo motor
Special AC servo motor
Reference Standards:
1.GB/T 16439-2009 "General Technical Conditions for AC Servo Systems"
2.GB/T 7345-2008 Basic Technical Requirements for Control Motors
3.JB/T 10274-2001 General Technical Conditions for AC Servo Motors for CNC Machine Tools
4.JB/T 10184-2000 General Technical Conditions for AC Servo Drives
5.GB/T 30549-2014 General Technical Conditions for Permanent Magnet AC Servo Motors
6.JB/T 10184-2014 AC Servo Drive General Technical Conditions
7. JB/T 11991-2014 AC Servo Motor for Industrial Machinery Digital Control System
8. GBT 30549-2014 Permanent Magnet AC Servo Motor General Technical Conditions
9. GBT 16439-2009 AC Servo System General Technical Conditions
10. GB/T 14817-2008 Permanent Magnet DC Servo Motor General Technical Conditions
11. GBT 1032-2012 Test Method for Three-phase Asynchronous Motor
12.GB/T 12350-2009 Safety requirements for low-power motors
13.GB/T 9651-2008 Test methods for single-phase asynchronous motors
14.GB/T 22669-2008 Test methods for three-phase permanent magnet synchronous motors
15.GB/T 16439-2009 General technical conditions for AC servo systems
16.GB/T 30253-2013 Energy efficiency limits and energy efficiency grades for permanent magnet synchronous motors
17.GB/T 50054-95 "Code for design of low-voltage power distribution"
18.GB/T 50055-93 "General Electrical Equipment Power Distribution Design Code"
19. Machinery manufacturing system according to GB9061-85
20. Electrical system according to GB5226-85
Test range and accuracy:
1.Power range: 100W~200KW power level, support other power levels of customization;
2.Test voltage level: 0~690V;
3.Speed range: 0~12000rpm;
4.Voltage/current measurement accuracy: ±0.01% of reading + ±0.03% of range
5.Electrical basic power measurement accuracy: ±0.03%
6.Rotational speed measurement accuracy: ±1rpm;
7.Torque measurement accuracy: ±0.05%F.S. Key features:
1. Functional modularization All benches are built with functional modularization, and the test system is concentrated in the form of module combination, and customers can add or decrease test modules according to the different test objects.
2. Advanced measurement means The advanced real-time measurement and control system is adopted, including input electrical parameter test, speed and torque test, etc., and the torque speed sampling rate is as high as 1000Hz, which meets the requirements of high precision and fast response of the test system, and provides transient data and eigenvalue data, which is convenient for the software to conduct a comprehensive analysis of the test process data in the later stage.
3. Complete test items According to the test requirements stipulated in the national standard, the test items can be increased or decreased according to the configuration module, which can meet the test items of various types of tests
4. Motor load The asynchronous motor/permanent magnet motor is used as the load of the tested motor, which changes the traditional load mode, improves the dynamic measurement range and accuracy of the torque and speed of the system, improves the loading performance (forward/reverse, reverse drag), shortens the response time of loading, realizes the loading of arbitrary load curve, and highly simulates the real-time operating conditions of the motor/drive. 5. Humanized design adopts a professional motor test bench, the fixture has a three-dimensional adjustment function, and is convenient for loading and unloading and coaxiality adjustment, which can adapt to the installation of the tested motor of any shape.
6. Customized test software The motor test system software developed by the software R&D team of Changniu Technology classifies the software interface and process according to the test items required by the national standard, reduces repeated tests, and greatly improves the work efficiency of testers. It also has the functions of real-time curve drawing, transient value capture, trend curve drawing and analysis, multi-parameter combination display, qualified judgment, report export and so on.