Shandong High Quality Mobile Asphalt Plant Drum Mixing Plant 20ton 30ton

Price $12999.00 Compare
Min Order 1 Set
Shipping From Shandong, China
Popularity 269 people viewed
Quantity
+-
 

Shandong Honghua Heavy Industry Machinery Co., Ltd

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
SLB30
Yes
One Year
Asphalt Mixing Plant
Asphalt Concrete Pavement
Fixed
Intermittent Compulsory
Automatic
40~400t/h
ISO9001: 2000
New
Oil
Gas
220/380
50Hz
Honghua
Nude Packed
SLB30
China
8474320000
Product Description
Shandong high quality Mobile Asphalt Plant drum mixing plant 20ton 30ton
Product Description

How Does The Asphalt Mixing Plant Work?
 
Asphalt batching plant is a set of equipment that produces final mixture batch by batch and characterized by intermittent pauses between batches. Due to the accurate weighing system for dosing the aggregates, bitumen, and other admixtures, the products of it are of high quality. It is utilized to heat, dry cold aggregates, and blend them with bitumen, RAP, and other binders as per diverse recipes to produce different final mixtures for road surface paving.

Components of Mobile Asphalt Mixing Plant:

1. Burning System
2. Drying Drum
3. Dust collector
4. Bitumen measuring system
5. Aggregate elevating system

6. Powder elevating system
7. Electronic control system
8. Finished product silo
9. Running system

 
Product Parameters
 
No.Main PartsQty.Notes
1Burning System(with firing device)1setKerosene dual-use combustion furnace, the furnace chamber is constructed using high-alumina cast refractory bricks.
2
 
Main MachineDrying System1setThe main material of the drying drum body is high-quality 16Mn steel.
Mixing and driving system1setMotor-driven, gear pair transmission
Bitumen conveying and measuring system1set Positive Displacement Metering, Pressure Conveying
Powder elevating and conveying system1setSkip elevator
Chassis1setNo.18 Heavy Channel Steel Integral Frame Welded Structure
3Dust removal system, overfeed sealing device1setCone tube cyclone dust removal, unique labyrinth sealing structure for material feeding method.
4Finished product silo (Type A)1setCapacity 9tons
5Automatic dosing station (Type B)1setPZ-50,3 batching buckets, electronic weighing, automatic metering
6Control Panel1setJapanese Omron PLC, Touchscreen Display Terminal
7Operate System1setEquipped with PLC programmable centralized automatic control and manual control.
 
Detailed Photos

 


 
 
Company Profile

Taian Honghua Machinery is the professional construction machines manufacture in Tai an city, Shan Dong Province, North part of People's Republic of China .

The main  products are
1.  Concrete batching plant (capacity 25. 35. 50. 60. 75 . 90. 120 .150 .180. 240m3/h)
2.  Asphalt mixing plant  (capacity 60t/h, 80t/h, 96t/h, 120t/h, 160t/h, 240t/h, 320t/h)
3. Aggregate blending machine with capacity 100t/h - 700t/h
4. Diesel generator sets (open type, sound-proof, silemt, trailer)
5. Attachments parts for mixing plant : cement silo, screw conveyor, conveyor roller & jacket , dust catcher, asphalt tank, conduct oil heating etc.

HONGHUA mixing plants are exporting to more than 40 countries and regions with stable quality and sincerely service.

We are the factory ! We can offer the best price ! Welcome to Honghua!

 
Pre-sale Service:
24 hours online.
SGS, ISO Certification available.
More than 30 years experience in construction platform industry.
After-sales Service:
24 hours telephone online
Training how to install and operate the concrete / asphalt mixing plant;
Engineers available for overseas installation guidance ;
Sufficient spare parts in stock provide for equipment whole life.

 
FAQ

Q:How many countries your equipment have been export?
A:More than 40 countries and regions, for example Bangladesh, East Timor, Malaysia, Azerbaijan, Myanmar, Cambodia, Congo, Indonesia, Brazil, Ethiopia, Philippines,Saudi Arabia,Russia, Uzbekistan, Papua New Guinea,and other countries of Africa and the Middle East.

Q:How many days of the production cycle of stationary asphalt batch hot mixing plant machinery?
A: usually 15days is enough, but in the hot season or during Chinese New Year, it will be 25-35days.


Q:How many days are used for installation of one set asphalt plant?
A: About 20-30 days,according to local situation,for example,the crane, power supply, electric welding equipment and other necessary instruments, material used for installation.

Q:How many workers are needed operating the stationary asphalt batch hot mixing plant machinery?
A:1 loader operator, 1 mechanical, 1 electrician, 1 the operator of the control system and 1 manager for the whole asphalt plant.
 
Q:Can I visit your factory?
A:Of course. We warmly welcome you to visit our factory at any time.

Q:Which service can you provide if I buy your products?
A:One year warranty, Assist customer for worksite layout and planning, Guide customer for foundation making, Guide customer for equipment installation, Training for operator and maintenance personnel, Provide life-time service, Provide spare parts timely, Professional service engineer regular return visit.


Contact with Lily to let me know which product are you looking for?
 
 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA