Simplified Construction of Cover Beam Formwork for Cast-in-Place Bridge Steel Concrete Formwork

Price $805.00 Compare
Min Order 10 Tons
Shipping From Zhejiang, China
Popularity 379 people viewed
Quantity
+-
 

Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
customized
Technical Assistance on-Line
1 Year
ISO, CE
Steel
Beam Formwork
Blue
Bolt
Spray Painted
Graphic Design
Bundling
Ton
Spot Supply
Zhongtai formwork
Standard Sea-Transport Packing
Customized
Shandong China
7308400000
Product Description

Product Description

MeaningCover beam steel formwork is a formwork system used in bridge engineering for cover beam construction. It is made of high-strength steel to ensure the stability and durability of the structure. 
 Material Q235B, 5+1 composite plate, 201 stainless steel
TypePre stressed concrete cover beam, ordinary reinforced concrete cover beam, customized according to drawings
AdvantagesExquisite design, smooth welds, tight joints, and beautiful appearance
PurposeConstruction of cast-in-situ bridge pier project


Detailed Photos

Company Profile

                Zhongtai steel formwork                               Process Manufacturing lssues


Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd. is a comprehensive enterprise integrating steel formwork product design, production, leasing, sales and service, providing one-stop purchase of flat formwork, cantilever hanging basket formwork, cylindrical formwork, cap and other steel formwork.

The company's products are widely used in the construction of bridges, roads, railways, subways, integrated pipe corridors, power stations, airports, water conservancy, tunnels and other engineering projects.


FAQ

1.Are you a trading company or a manufacturer?
 We are an industry-trade company.

2.What do you do?
We design and manufacture formwork and scaffolding products for concretestructure pouring in engineering projects such as bridges, highways, railways.subways, comprehensive pipe galleries, power stations, airports, waterconservancy,tunnels,etc.

3.How long is the delivery(production) and shipping time?
If the goods are in stock, we will arrange shipment within 3-5 days after receivingyour down payment. lf the goods are out of stock, they will be determined based onthe quantity.

4.Why do you buy from us instead of other suppliers?
1. Professional team, 12 years of market experience;
2. Own source factory supply, production capacity of 300,000 tons/year;
3. One-stop service center to meet all steel formwork needs;;
4. 24-hour online service

5.How to confirm payment?
1. T/T: 30% T/T of the advance deposit and 70% T/T of the balance before delivery;
2.Letter of Credit:100% irrevocable letter of credit

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA