Slab Formwork Steel Frame Formwork T-Form with Early Stripping Device for Concrete Slab

Price $75.00 Compare
Min Order 100 Pieces
Shipping From Jiangsu, China
Popularity 442 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
formwork
Remote Service
1 Year
ISO, CE, ISO9001
Q355steel
Slab Formwork
Steel
Hotel, Wall, Column, Core Tube, etc
Jiangsu, China
Customised
Lianggong
Standard Package
Standard & Customized
Yancheng, China
Product Description

Slab Formwork Steel Frame Formwork T-Form with Early Stripping Device for Concrete  Slab

Product Description

T-Form System

Item Model Dimention AreaUnit weight
(kg)

T-Form Panel
TF18121800X1200mm2.1644.000 
TF18091800x900mm1.6238.000 
TF18061800x600mm1.0830.000 
TF15121500X1200mm1.840.600 
TF15091500x900mm1.3533.000 
TF15061500x600mm0.925.000 
TF12121200x1200mm1.4432.000 
TF12091200x900mm1.0826.000 
TF12061200x600mm0.7222.000 
TF0909900x900mm0.8122.000 
TF0906900x600mm0.5418.000 
TF0606600x600mm0.3613.500 
 

T-form for Slab concrete 

T-form is for horizontal floor concrete.With many sizes,the biggest size is 1800X1200 mm, each panel with the early stripping mechanism,it can shorten the construction period and save your time. 
The erection speed is as high as 60-100 square meters per person per day.
Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.3-4 workers in a team can quickly and easily set up and remove the panels.
 
Products Show
 



Characteristics
 
1. Slab Requirements: Designed for slabs ≥100mm thickness and c oncrete grades of C20 and higher.
 
2. Construction Planning: Detailed plans include guidance files, engineering layouts, supp ort structure drawings, and safe bearing cap acity calculations.
 
3. Formwork and Supp ort Quantity: Determined based on plans to meet quality and safety standards.
 
4. Compliance: Adheres to national and local standards and specified regulations.
 
5.  Safety and Reas onable Design: Ensures safety and quality assurance throughout c onstruction.
 
6. Ec onomic Rationality: Cost-effective and efficient resource utilisation.
 
7. Simplified Operation: A user-friendly system facilitates easy installation and removal.

Packing & Delivery
Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 25-30 days, it is according to quantity.
Port:  Shanghai,Qingdao


Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
 

Customer Photos
 
 


 
FAQ

Q1:Are you trading company or manufacturer?
A:We are manufacturer for 12 years.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3-5 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~40 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA