Sliding Wing Block Drill Casing Overburden Equipment for DTH Reaming Hole Drilling

Price $3700.00 Compare
Min Order 1 Piece
Shipping From Fujian, China
Popularity 497 people viewed
Quantity
+-
 

Xiamen Sansung Mining Equipment Co., Ltd.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
QL50, QL60, QL80, SD10, SD12
ISO 9001:2000
GB, GOST
Spray-Paint
Casting
Alloy Steel
185-425mm
Ql50 Ql60 Ql80 SD10 SD12 DHD350 DHD360 DHD380
100% New
20-30days
1PCS
on Request
Yes
Yes
SANSUNG
Carton
168-406mm
China
82071300
Product Description



We are a leading manufacturer of rock drilling tools, like DTH hammers and bits, DTH drill pipes, RC hammers and bits, top hammer button bits, coupling, cross bits, drill rods located in Xiamen,Fujian,China.

Product specifications: Slide block casing system


 

Casing Tube

OD(mm)

Casing Tube

ID(mm)

Reamed

Dia(mm)

Casing Shoe

ID(mm)

Hammer Type

Drill Pipe(mm)

168

148

185

138

DHD350/QL50

76/89

178

158

195

148

DHD350/QL50

76/89

194

174

206

163

DHD360/QL60

89/114

219

199

234

187

DHD360/QL60

89/114

245

225

264

212

DHD380/QL80

114

273

253

308

237

DHD380/QL80

114

325

305

350

283

NUMA100/SD10

114

406

382

425

360

NUMA125/SD12

127

 

Features

Hardening treatment of the part's surface with longer operating life and excellent anti-wear properties.

Structural Optimization, improving the structural strength and ease of operation

Superior Performance, high drilling speed with stable and reliable performance

Application Range

It is suitable for drilling water wells, geothermal wells, short micro piles,medium mini-type grouting hole of building, demand harbor project.

Operation Procedure

1.when the drilling starts, the wings swing out, and reams to drive the casing shoes and tubes into the hole.

2.When finished the drilling in overburden rock formations, reverse the drilling tools and the wings will get closed, and the drilling tools can be raised from the hole.

3.Next construction can be followed.

Quality warranty

Our products are made of high quality steel and all spares parts are inspected strictly before shipping.

Production time

within 15-25 days after receiving the advance payment or full payment

Transportation

according to your requests.

Package
The material of packing is ply-wooden cases and pallet to avoid the damagement  in transportation.




 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA