Slm 3D Printer Machine Industrial Provided High Performance Automatic Metal 3D Printer

Price $1.00 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 215 people viewed
Quantity
+-
 

Jiangsu Global Laser Box Digital Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
200M
STEP, STL
1
USB
200-500mu
20-80mu
Metal
Slm
Windows10
φ150mm*90mm
120 Crowns(6h)/11 Frameworks(8h)
800kgs
0.03mm-0.06mm
7-12m/S
Global Laser Box
Wooden Box Packaging
1280mm*810mm*1860mm
China
Product Description
Product Description


1. Big enclosed size: using integrated design, very easy to operate.
2. Simple operation: the software interface is friendly and easy to learn; integrated automatic centering function, the operator can easily place the crystal.
3. Strong adaptability: according to the movable requirements of the machine, the core components are equipped with a shock-proof system, which can effectively prevent damage to the core components of the machine due to accidental impact during equipment transportation and use.
4. Fast engraving speed: using galvanometer laser high-speed scanning working mode, the speed can reach up to 300,000 points/min, saving engraving time.
5. High stability and delicate engraving effect: using advanced air-cooled semiconductor end-pumped solid-state laser technology.
 
6. Adopt sealed integrated design, good beam quality, high stability, and delicate engraved dots. Can work stably for a long time.
 
Product Parameters
   
Equipment Size1280mm*810mm*1860mm
Print sizeφ150mm*90mm
Production120 crowns(6h)/11 frameworks(8h)
Machine Weight800KGS
Powder Layer Thickness0.03mm-0.06mm
Powder Delivery MethodBottom-feed Powder Delivery
Powder Spread MethodOne-way  Powder  Spread
Scanning Speed7-12m/s
Control SoftwareDeveloped  by  GLOBAL  LASER  BOX (YM  Build  II )
Data Processing SoftwareVoxelDance
Laser BrandEVERFOTON
Scanning SystemPSI High Precision Scanning System
Beam Diameter90-120μm
Laser Power500W×1
Protective GasNitrogen, Argon
Equipment Power3KW
Operating EnvironmentTemperature 25±3°C, Humidity <75%
Supported Print File FormatSTL
Automatic Setup and Monitoring AlarmSupported
Company Profile

FAQ

1. What is the electrical configuration to install to power the machine, socket, power supply, electrical safety
 120 M
Voltage 220V the socket can change local standards
 water cooling
Voltage 220V 
 powder collector
Link the printer for power supply

2. Slicer software
 price
$1500/Year,$7000/Life time

 who does the maintenance
Software company

 Cost of maintenance and update
The fee includes maintenance and updates.

3. Information on chrome cobalt and titanium powders

 Heat treatment process for framework and coping/full unit and long bridge
  Different powder have different heat treatment powder temperatures.
It is only related to the materials and has no relation to the printed products.

 Different granulometry offered

15-53μm 
 Photo for marketing


 Packaging I must personalize
I do not recommend changing the manufacturer's name and logo
Because it involves a certificate.



4. Support disc chrome cobalt and titanium
 Thickness
20mm
 Fixing in the machine
Magnetic

 How many prints to recommend
Recommended printing times: over 200 times; grinding amount: remaining 8-9mm.
 How to surface after printing
Grinding bed, Hand Grinder

5. Photos and video of the technical parts of the machine
 Electrical compartment
 Laser compartment
 Filtration compartment
not available for now

6. Maintenance after photo and video printing
 Time for cleaning before reprinting
Cleaning time before reprinting: Clean the forming chamber for ten minutes.
 Annual maintenance
The permanent filter cartridge requires no maintenance and can print over 20,000 times.
 Cleaning the powder collector
Permanent filter element does not require cleaning.
 Water level of the water cooling
Add purified water above green.

7. Surveillance camera information
 Remote connection to PC and telephone
 Send a video so that I can check

8. Chrome printing times and quantity cobalt and titanium
 Framework
7-8
 Coping and full
80-90

9. how long is the training
 learn the slicer
 learn the machine software
 learn the machine start-up
 learn the post-processing
 learn the machine cleaning and collector
 learn the annual maintenance
About 3 days

 



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA