Spring Steel Raw Material for Band Saw Blade

Price $1500.00 Compare
Min Order 1 Ton
Shipping From Jiangxi, China
Popularity 313 people viewed
Quantity
+-
 

HONG SHENG SAWS MANUFACTURING CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
HS2020923
ASTM, JIS, GB, AISI, DIN, BS
ISO
Blue, Polishied, Bright, Golden.etc
Cold Rolled ,Annealed,Heat Treatment
Band Saw Blade,Cutting Tools
Rounded Edge
Customer Made
51CRV4.C67,C75/,Ck85,75ni8,Sk5.etc
0.5-2.0mm
15-300mm
44-48HRC
Polished,Bright,Blue,Golden.etc
Factory
1tons
T/T,L/C,D/P.etc
Each Coils with Light Oil and Plastic Film
Then Wrapped in Anti-Rust Paper with Pallet
Cold Rolled ,Annealed, Heat Treatment
20-25days After The Order Confirmed
Cgood
Each Coils with Light Oil and Anti-Rust Paper
0.5-2.0x15-300mm
China
72112900
Product Description
Product  Description
Product Name spring steel raw material for band saw blade
MaterialCK67/CK75/C67S/C75S/C67/C75/SK5/51Crv4/75Cr1/75Ni8.etc
Colorblue polished,polished-bright,white,blue,yellow.etc
Techiniquecold rolled,annealed,heat treatment with hardened and tempered
Hardness44-48hrc
EdgeRounded,Slitted
Application band spring,rolling door spring,rolling shutter spring,rolling shuter accessories
packageeach bundle with light oil and plastic film then wrapped in anti-rust paper with metallic pallet 
The Regular size the clients request
16 x 0.5616x0.620x0.625x 0.620 x 0.725 x 0.720 x 0.8
25 x 0.830 x 0.735 x 0.832 x 0.740 x 0.840x 0.940 x 1.0
40x 1.150x 1.060x1.060 x 1.1100 x 1.2120x1.2125 x 1.25
50 x 1.0152.4x 1.2177.8 x 1.47203.2x 1.47127 x 1.47203.2 x 1..65228.6x1.63
 Production Show

 Application 
band saw blade,saw blade.etc

 Production Show
From first-rate raw material, cold rolling, quenching and tempering process, de-burring edges, etc, each production step, is checked carefully in width, thickness, hardness, edge as flexibility, toughness.etc
  Our factory
our factory is a leading supplier high carbon steel strip,alloy steel strip and stainless steel strip in two  heat treatment ways - hardening & tempering conditions and cold rolled annealing conditions.Occupying 25,000 square meters manufacturing area
  Our Team
 Inspection(only after all the goods pass the QC that can be delivery)
Package&Delivery
Packing Details : each coils with light oil and plastic film then wrapped in anti-rust paper with metallic pallet
Delivery Details : 25-30days after the order confirmed
 Our Certifications
Customer Visit
 FAQ
Q: Are you trading company or manufacturer ?
A: We are factory
Q: How long is your delivery time?
A: Generally it is 25-30days after the order confirmed
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: T/T, L/C,D/P..etc
If you have another question, pls feel free to contact us

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA