Steel Column Slab Wall Formwork for Concrete Construction

Price Negotiable Compare
Min Order 200 Square Meters
Availability In Stock
Shipping From Shandong, China
Popularity 510 people viewed
Quantity
+-
 

Shandong Shlomi Machinery Co., Ltd.

VIP   Audited Supplier 9 years
Profile Certified by SGS/BV
SLM-F
Steel
Column Formwork
Red or Customized
Above 60kn/Sqm
Above 200 Times
Around 90kg/Sqm
Customized
SHLM
Standard Export Package
Customized
China
73084000
Product Description


PRODUCT DESCRIPTION

Fromwrok system

Steel Formwork is the most conventional formwork of different kinds of steel material, it is not only used in metros, bridge piers, tunnels, but also other irregular shape of concrete structures.

Feature

* Customized panel size and shapes are available;
* Ready to use pre-assembly;
* Can be cast into any size and shape according to different project structure;
* Well compatible with other formwork components.

Application

Irregular bridge piers, shaft core walls, residencial & commercial buildings, basement, bridge piers, columns ect..


Technical Specification

* Width: 0.3m/0.45m/0.6m/0.9m/1.2m/1.5m/1.8m/2.1m;
* Height:2.7m/3.0m;
* Or any customizes unit sizes according to structural drawings

 
 
 

PACKING&DELIVERY

1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

 

 

Shandong Shlomi Machinery Co., Ltd. is a professional supplier since year 2008 which produce the steel fromwork wall formworkslab formworkcolumn formwork, climbing formwork, slip formwork ,Scaffolding Accessories, Formwork accessories,Shoring Prop and so on ,We have a strong and highly efficient R&D team which can design and make OEM/ODM products according to your ideas and samples or drawings.
We insist on the "superior Quality, Competitive Price" to reach win-win situation with our customers. our main customers come from Europe, the Middle East, Australia, America and the South Africa..                                 

Important Instructions:

• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer's design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Why us: 
With 12 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 
Shandong Shlomi Machinery Co., Ltd. welcome friends all over the world !



  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$2.00 1000 Pieces(MOQ)

Shlomi En74/ BS1139 Double Coupler /Fixed Scaffold Coupler

Shandong Shlomi Machinery Co., Ltd.
$30.00 750 Pieces(MOQ)

Building Galvanizd Scaffold Heavy Light Duty Telescopic Post Adjustable Formwork Construction Scaffolding Support/Shoring Steel Prop

Shandong Shlomi Machinery Co., Ltd.
$2.00 1000 Pieces(MOQ)

BS1139 British Drop Forged Scaffolding Double Coupler 48.3mm*48.3mm

Shandong Shlomi Machinery Co., Ltd.
$1500.00 1 Ton(MOQ)

Construction Aluminium/Steel Q233 Q345 Ringlock/Layher/Layer System Scaffolding

Shandong Shlomi Machinery Co., Ltd.
$315.00 100 Pieces(MOQ)

Construction Material Steel 100 Ton Jack in Concrete and Formwork Contractors

Taishan Dongkuo Steel Structure Co., Ltd.
$10.00 1 Piece(MOQ)

Rapid Assembly Plastic Ventilation Formwork for Heavy Loads

Suzhou Topo New Material Co., Ltd.
$25.00 100 Pieces(MOQ)

PVC Concrete Formwork Sheet Hollow Plastic Formwork Board for Building

Hunan ADTO Building Materials Group Co., Ltd.
$0.50 10000 Pieces(MOQ)

Formwork Accessories Mivan Pin/ Alform Pin/Stub Pin and Wedge

Younsion Fastening Industrial Co., Ltd.
$8.00 200 Pieces(MOQ)

Heavy Duty Adjustable Galvanized Scaffolding Steel Shoring Props Puntal De Acero Construction

MTM BUILDING MATERIALS CO., LTD.
$200.00 19999 Pieces(MOQ)

Aluminum Light Weight Wall Formwork Precast Concrete Forms

Qingdao Scaffolding Import and Export Co., Ltd.