Steel Formwork System for Adjustable Columns

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 492 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is renowned for its strength and durability, making it the ideal choice for repetitive use in construction projects. Its ease of assembly and fixed shape make it perfect for large-scale applications such as high-rise buildings, roads, and bridges.
 

Packaging:

1. The total net weight of a loaded container typically ranges from 22 to 25 tons. This must be confirmed prior to loading.
2. We employ various packaging methods tailored to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time varies depending on the destination port.
3. Special requirements will be accommodated through negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.

Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.

Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to construction project stakeholders, including owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We collaborate internationally with peer companies, offering our exceptional formwork products.

Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific project requirements.

Q5: How long does it take to manufacture products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.

Q6: What are your payment terms?
A: We require a 30% T/T advance, with the balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA