Steel Formwork System for Viaduct Construction

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 300 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System stands as a testament to strength and durability, ideal for repeated use across various construction projects. Effortless in assembly and erection, this system is tailored to meet the demands of high-volume, same-structure applications such as high-rise buildings, roads, and bridges. It offers a fixed shape and structure, ensuring consistency and reliability on every project.
 

Packaging:

1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Different packages are tailored for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are secured in bags and placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days following receipt of the customer's down payment.
2. Transportation: Lead times vary depending on the destination port's charges.
3. Special requirements necessitate further negotiation.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products primarily used forbridge and tunnel construction.

Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: Our outstanding formwork products are also available to support our peers worldwide.

Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after contract signing?
A: Typically, it takes 30~60 days, contingent upon the type and quantity of products ordered.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA