Steel Formwork for Viaduct Column Construction

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 201 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our steel formwork is renowned for its exceptional strength and durability, ensuring it can be reused multiple times in various construction projects. Its simple assembly and erection process make it incredibly user-friendly. The fixed shape and structure of our formwork system are ideal for projects requiring a large number of identical structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, a figure that needs confirmation prior to loading.
2. We utilize different packaging methods for different products to ensure optimal safety and convenience:
---Bundles: Ideal for timber beams, steel props, tie rods, and similar items.
---Pallets: Smaller parts are securely placed in bags before being organized on pallets.
---Wooden Cases: Available upon customer request for added protection.
---Bulk: Used for loading irregular goods efficiently in containers.
Delivery:
1. Production: For a full container load, we typically require 20-30 days post receipt of the customer's down payment.
2. Transportation: Delivery time depends on the destination port.
3. Special requirements may necessitate further negotiation and planning.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a highly professional stencil-making company, boasting ownership of two fully operational factories.

Q2: What exactly do you do?
A: We specialize in the design and manufacture of formwork products tailored forthe construction of bridges and tunnels.

Q3: What services can you provide us?
A: We offer expert suggestions, detailed formwork layout drawings, and comprehensive quotations to project owners, design institutes, and contractors.
B: Our products are sold to contractors, construction companies, material suppliers, and trading firms.
C: We also support our international peers with our high-quality formwork solutions.

Q4: How long does it take to prepare a preliminary design and quotation once we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific needs of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, the production period is between 30~60 days, influenced by the type and volume of products required.

Q6: What are your payment terms?
A: We require a 30% T/T in advance, with the remaining balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA