Steel Scrap Induction Melting Furnace

Price $1000000.00 Compare
Min Order 1 Set
Shipping From Shaanxi, China
Popularity 206 people viewed
Quantity
+-
 

Chang Year Mechatronics Technology Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
CY1988MF222
CE, ISO
Horizontal
Industrial
IF Furnace
Steel Melting
Electric
as Client's Request
Online and Insite Guidance
Factory and Insite Training
1t,2t,5t,10t,etc
Changyear
Seaworthy Packing
depends on
China
8514200090
Product Description
 
Product Description

Intermediate frequency induction melting furnace 

The Smelting Furnace made by our company also called coreless induction furance,is widely used to smelt ferrous metal such as steel,steel alloy and iron,nonferrous metal such as stainless steel,copper,molybdenum, and zinc and keep temperature after
smelting.

Detailed Photos




Product Parameters

                                                  Main Parameters of IF Non-core Induction Smelting Furance

Nominal Capacity Nominal Power Nominal FreqPower Factor(%)Input VoitageSmelting Steel(1600ºC)Smelting Iron(1450ºC)Water consumption(t/h)
Smelt Ratio(t/h)Electric Power Consumption(Kw.h/t)Smelt Ratio(t/h)Electric Power Consumption(Kw.h/t)
0.52501000>0.923φ 380V~440V 50HZ/60HZ0.385960.45688
0.53500.565900.65608
0.55000.85900.8556010
15000.845600.8655010
1.51500500>0.92
 660V 50HZ/60HZ
2.495602.655030
210001.715551.8254020
215002.565552.7154030
220003.425553.6454045
315002.675502.8153930
320003.555503.7453945
325004.455494.6853850
525004.465354.752050
53000
 750V 50HZ/60HZ
5.355355.6452060
535006.255306.5851970
840007.185287.5651880
850008.975289.45518100
8600010.7752811.34510120
1050008.985289.46510100
10600010.7752811.35510120
10800012φ
 950V 50HZ/60HZ
14.3752815.13510160
12600010.7852811.35510120
12800014.3752815.13510260
15800014.3752815.13510160
15900016.1752817.03510165
201000017.9752518.97500200
201200021.5652522.7500240

                                        Standard International Packing for Safety Shipping

 

Company Profile

Changyear is located in the famous historical hometown of industrial furnace in Xi'an China. Changyear has over 30 years manufacturing experience in the industrial furnace and gains lots of professional technology and production experiences.
Based on the constantly improving of advanced technology and exploring from domestic and international market, high quality service for all of clients all around the world, and with wide range, good quality, reasonable prices and perfect designs, our products are extensively used in steel plants and metallurgical industry.


 

Our Advantages

We have own technology and patent design and extensive practical experience in hundreds of projects,with over 40 years experienced professional and efficient design team,as well high quality manufacturers with reliable supply chain to support your project and equipment well running.

After Sales Service

* Pre-acceptance and training of equipment
After all the equipment is manufactured, the buyer's relevant technical personnel are invited to the equipment manufacturing factory to participate in the pre-acceptance and training of equipment.

**Pre-acceptance content:
(1) General inspection
(2) Safety inspection
(3) Induction coil assembly size inspection
(4) Induction coil manufacturing quality inspection and insulation withstand voltage test
(5) Measurement of the electrical gap between the induction coil and the heating body
(6) Insulation resistance measurement of induction coil and fixed body
(7) Measurement of insulation resistance between induction coil and fixed screw rod
(8) Medium frequency coil insulation withstand voltage test
(9) Pressure test of hydraulic system
(10) Hydrostatic test of induction coil
(11) Inspection of electrical interlocks and ancillary devices
(12) Inspection of various protection functions such as electrical fault display, monitoring, and alarming
(13) Accessory kit inspection, including model, specification, and factory certificate inspection
(14) Inspection of the scope of supply and completeness of factory technical documents

**Training
 The seller provides users with technical training on the following contents:
(1) Equipment installation training
(2) Training on electrical control design principles (including: protection, monitoring, fault display, etc. in electrical design)
(3) Equipment repair and daily maintenance training
(4) Training on troubleshooting of common equipment faults and special faults

** All pre-acceptance items and test data should be attended and signed by personnel from both parties, and should be provided to the user for archiving.

** Only after the acceptance work is completed and both parties agree to sign, can the seller package the equipment for shipment.

*Installation, debugging and final acceptance
1 After the equipment arrives at the site, relevant experts will be dispatched to the equipment installation site to guide the installation according to the time notified by the user. After the installation is completed, the equipment will be debugged.
2 The seller's experts will provide on-site training to the user's equipment operation and maintenance personnel on the operation and maintenance of the equipment.
3 The final acceptance of the equipment should be at the user's site. The acceptance items include:
(1) All factory inspection items and comprehensive safety inspections;
(2) Measurement of sensor power and heating productivity;
(3) Measurement of cooling medium temperature rise;
(4) Measurement of sensor component temperature;
(5) Measurement of workpiece temperature;
(6) Check the deviation between the workpiece temperature and the set temperature;
(7) Check the reliability and sensitivity of the alarm system;
(8) Verification according to the provisions mentioned in the technical requirements;
(9) Verification of equipment trial operation stability.
After all project inspections and tests are completed, a final acceptance report will be written and will take effect after both parties agree and sign.

*Product quality control measures
1 When selecting raw materials and external accessories, our company has established a complete set of qualified sub-suppliers to ensure the quality of raw materials and external accessories.
2 During the production process, each component has a quality responsibility tracking card indicating the person responsible for each processing step and the final inspector. There are special process rules for key parts such as inductors and reactors to ensure that unqualified parts from the previous process will never flow into the next process.
3 Products must undergo factory inspection before leaving the factory. The content includes appearance inspection, mechanical dimensional inspection, insulation inspection of induction coil, withstand voltage test and water pressure test. After passing all inspections, the inspector will fill in the product qualification certificate and archive various test data records to ensure traceability of product quality.

* Product Quality Guarantee
1 This equipment is made of brand new, high-quality materials that are consistent with the equipment's technical specifications. All material aspects are consistent with the equipment's technical specifications.
2 The main external accessories of the equipment have product qualification certificates issued by the original manufacturer.
3 This equipment has a warranty period of 18 months from the date of shipment. During the warranty period, if the equipment fails due to poor manufacturing or poor quality of external accessories, the buyer will repair or replace the corresponding parts free of charge.
4 Provide 24-hour response service. After receiving the user's service request, the fault problem will be solved within 24 hours domestically.
5 Ensure the stability of parts production and provide spare parts to users at preferential prices (lower than the market price in the same period) in the long term.


*After-sales service
1 Answer users' questions and provide users with advanced technical information free of charge.
2 Provide equipment floor plans and civil foundation reference drawings.
3 After the plan design is completed, users are invited to participate in the plan review.
4 During the product manufacturing period, users can supervise the manufacturing progress and inspect the quality of the product at any time as needed.
5 Provide users with complete and accurate technical information.
6 Provide users with technical guidance on equipment installation and equipment debugging.
7 Provide training to user technical, maintenance and operating personnel.
8 The equipment is guaranteed within 18 months from the date of delivery and free maintenance for life, and only the cost is charged.
9 Various special spare parts are available all year round.
10 If the equipment fails, we will provide 24-hour response service and troubleshoot in a timely manner.



 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA